116 – Chasewater Railway Museum Bits & Pieces
From Chasewater News January 1988
From the Editorial
It is eleven years since I last prepared an edition of our Railway’s magazine. I do so now following our Publicity Director’s decision not to stand for re-election fro personal reasons. As Company Chairman, however, I intend to act purely as a commissioning editor, so as to avoid any accusation of bias in editorial policy. Rob Curtis has also decided to stand down, as he is about to start a new job and sadly no longer has the time to be as active on the Railway as in the past.
From the first AGM of the Chasewater Light Railway & Museum Company
The new Board for 1988/89 is composed thus:
Chairman – Steve Organ
Engineering Mgr – T.R.Sale
Operations Mgr – N.V.Canning
Commercial Mgr – B.J.Bull
Financial Mgr – L.J.Emery
Ex Officio – I.M.Newbold, A.C.R.Hall
In addition, the vacant posts of General Manager and Publicity Manager will be covered for the time being by Tony Sale and Steve Organ respectively. Further, Adrian Hall has offered to continue as Company Secretary.
The (lost) Causeway
Many of our members have in recent weeks expressed concern about the condition of the causeway which we hope to run passenger trains across to the far side of the lake eventually. The problem is that some years of neglect, and very high levels of water in Chasewater, coupled with long periods of high winds causing severe wave action to erode the sides of the causeway have combined to completely breach the causeway.Our Company is powerless to do any remedial work, since we at present have no ‘Lawful Interest’ in the causeway, i.e. we don’t lease it at the moment.
Representations have been made to the local authority, Walsall Council, and at a recent meeting of the local authority’s recreation and amenities committee, the Engineer’s Department of Walsall Council were invited to make a detailed study of the problems and to investigate ways of restoring the whole of the causeway to an overall width which would allow both a Railway and a footpath to cross it. Further, the Waterways Board have said that they will from now on abstract water from Chasewater before any of their BCN reservoirs, and also that this summer, the water level will be kept at a very low level. This would allow for remedial works to be carried out.
One further point is that a Consulting Civil Engineer has, at our Company’s request, and without charges, examined the causeway, and suggested a relatively low-coast solution to the problem, and as soon as we receive his report, the local authority would like a copy – so perhaps all is not lost. I hope to bring further news in the July edition of Chasewater News, but be assured that the Board are making as strong a representation as possible to Walsall Council about this vital link to Chasetown.Engineering Manager’s Report
Following a late start in 1987, we were able to run a train service for the first time since 1982, for which two locos, Asbestos and the Sentinel, and the Gloucester trailer coach were available. No failures or serious faults occurred, although it has become apparent in this first season of continuous brake operation that improvements to the system can be made by relatively simple alterations to the system. This work, along with annual maintenance, is now being carried out in readiness for the 1988 season, for which initially the same locos and coach will be used.
Work on four privately owned locos is currently being carried out on site, and their owners continue to put in a great deal of work on the Railway as well as their own locos. The most likely of these to be steamed first is No.2 ‘Lion’ probably followed by No.7 ‘Invicta’ or No.3 ‘Colin McAndrew’. Please feel free to come and see work in progress on these on any Sunday.
One priority job for the loco dept in 1988 must be the fitting of vacuum brake gear to one of the diesels to enable trains to be run on non-steaming days, and to provide cover in the event of a steam loco failure. The cost of fitting this equipment, about £250, would be easily covered by the train fares taken on the event of ‘opportunist’ train operations i.e. where lots of people are in the park and we are not scheduled to run trains.
Another project for 1988 is the repair and restoration of the Wickham Trailer car. This will allow us to run two-car trains for the first time, and doing so will allow us to generate extra income through the opening of a bar car, will give us extra braking power on trains, and will allow us the luxury of a spare coach in the event of a failure.
The coach is in basically sound condition, but requires seven new windows, and the doors require stripping and re-building.
Extension News
On 7th March, I formally applied to British Railways Board for License to operate passenger trains over the section of line from Willowvale Bridge to the Causeway.
The application to BR followed the purchase of the land from BR by Walsall Council, which was completed in November last. Our Company’s predecessors bought the track on the land some years ago, but the Council slowed down the procedure of buying the land when our group ran out of steam in the early eighties, and only revived when our New Company breathed new life into the Chasewater Railway Project in October 1986.
Because we bought the track, BR gave us permission some years ago to maintain the formation of this section of line, so we very recently carried out work on the bridge, so that if BR give us the license we need, we can very rapidly move on to the section: I would feel we should be running trains along this stretch within 9 months of possession, to maintain the impetus of development of the line. Steve Organ
Civil Engineering
Work in this area has been concentrated in the last year on maintenance and simplification of the trackwork, incorporation of the Railway Inspectorates requirements, such as the installation of trap points, Annets locks, fencing, etc. Whilst this work may seem tiresome, it is part and parcel of the business of running a railway and allows us to operate in confidence and in SAFETY. We are fortunate in the field of trackwork to have over the last year, gained a member, Chris Chivers, with experience and enthusiasm for p-way work (when he’s not setting things on fire).
We have also to thank Mr.J.L.Townsend, M.I.C.E., who has recently undertaken an inspection of Willowvale Bridge, and provided a formal report and detailed specifications for remedial work to it, work which is likely to be largely complete by the time you read this.
In view of the progress made in the last year, we are now making detailed plans for the future.