Category Archives: Bits and Pieces

Chasewater Railway Museum Bits & Pieces Nos. 49 & 50 Late 1969

Chasewater Railway Museum Bits & Pieces No 49

From the Mercian of September 1969

Secretary’s Report – A.A.Chatfield Acting Hon. Secretary

Vandalism at Hednesford

It is my sorry duty to inform all members that as a result of a break-in by some unknown gang of juvenile delinquents the interior of the Royal Saloon – our most priceless vehicle – looks as if it has been under the axe of some demolition contractors.  Irreplaceable panelling has been deliberately smashed in, interior door panels including glass mirrors stove in completely and a wanton trail of damage to the tune of at least £150 done to the interior. (A great deal of money some 40 years ago!).

The police have been to the depot but without some positive information they are unable to do very much at this stage.  The depot at Hednesford is vulnerable seven days a week and until the stock is moved to Chasewater en bloc where it will be afforded more protection then we are going to suffer even more vandalism which will not only delay the restoration process, but increase our expenditure and, what is more important, lose us our most valued working members to whom these sorts of acts are extremely disheartening.

Then followed an appeal for £800 to move the bogie vehicles at least from Hednesford to Chasewater.

The acting Hon. Treasurer, Laurence Hodgkinson, repeated the appeal and stated that, if the work at Chasewater continued at its present rate, the compound would be ready for the stock from Hednesford by the Autumn.

Amongst the new members joining the Society – B.J.Bull Esq.

Chasewater Railway Museum Bits & Pieces No 50

The next three posts are sort of connected.

The first sets out the thinking behind the Railway Preservation Society,

The second takes a look into a possible future for the railway.

The third tries to give the reason why  the second didn’t happen!

 

From the Editorial of the November/December 1969 Mercian

Food for Thought

It has often been said that the first ten years of marriage are the most difficult and if this is any yardstick then our first ten years have been one continuous struggle.  Members may ask the question ‘Why?’ when they can see all around us other schemes, which are as little as two years old, flourishing with membership in the thousands.  Here we are in our eleventh year and what have we got to show for it?  May I try to explain a very subtle difference between our Society and other schemes which flourish around us and leave us completely in the shade?

We are a preservation Society first and foremost, we are not interested in ‘playing trains’ on some unwanted British Railways branch which can be snapped up for anything from £200 to £400,000 in order to be re-opened as a tourist attraction with weekend traffic to satisfy the ‘locals’.  Our first aim is to preserve, what we do with the items after that depends a great deal upon what they are.  Our range is therefore very extensive, running from a button to a carriage or locomotive, and to this end our record at the moment is pretty formidable.

We do not rely, as do many of our competitors, on other people loaning us locos or rolling stock with which to operate, we have paid for all our relics the hard way – THEY ARE OURS.

You might then ask ‘but if we are a preservation group only, why are we hoping to run trains at Chasewater?’  This can be answered quite simply.  We are restoring, within the confines laid down by the Local Authority, a stretch of track which formed part of the old Midland Railway branch line from Brownhills, and by restoring I mean every sleeper, chair, nut, bolt and rail completely from scratch, in other words, preserving something which is part of the local railway history.

Obviously it would be a complete waste of time if after doing this we let the track become derelict again, and so primarily for the benefit of our members and also for the enjoyment of the visiting public, we hope that we shall be able to put some of our assets to workup and down the short stretch of line which has been relaid.

We have started from scratch, from the ballast upwards, that is where our difference lies from the other preservation groups around us who are enjoying more success.

It seems that every enthusiast will interest himself in a scheme if he can be an engine driver, but when it comes down to relaying track, restoring locos and carriages or doing the other thousand and one back-breaking menial jobs that have to be done he just does not want to know.

Who is going to be the loser in the long run?  I do not think it will be our Society because we have so much in preservation experience from the bottom to the top to offer and yet still have a long way to go.

‘We have never had it as good’ if I may alter a well known saying. (For those who remember Harold MacMillan – Prime Minister 1957/1963).

Other schemes may fade away when the novelty wears off or when setbacks arise but we have had more than our fair share of setbacks over the past ten years and we have learned to take them on the chin and what is more, to come back fighting again as full of spirit as ever.

Pockets may be very deep when it comes to paying out hard cash and this may be very good for the enthusiast’s conscience, but when you ask yourself honestly – ‘am I really preserving?’ – is the answer always YES. I often wonder.  After ten years as a Society may we all hope that the next decade will see the realisation of the efforts which have been put into the Society by a list too long to mention.

Chasewater Railway Museum Bits & Pieces 48 Mercian July 1969, plus a few photos from 2009

5448 Wimblebury No.7 0-6-0ST H 3839-1956 June 1969 Hunslet

Chasewater Railway Museum Bits & Pieces 48 Mercian July 1969, plus a few photos from 2009

From the Mercian of July 1969

Following a disagreement the Committee published a special message announcing the resignation of the Hon. Secretary, Hon. Treasurer and Vice-Chairman.

The acting Hon. Sec. A.A.Chatfield put together a report at short notice, stating that the usual progress is being slowly maintained, but more hands were still needed.

Mike Lewis had been packing the track near the compound and helped to alleviate the flooding problem.  Steve Allsopp and Brian Hames have completed the overhaul of No.21 and have given her a spanking new coat of paint.

Derek Luker has been working on the steam locos with his small band of helpers and ‘Asbestos’ is now ready for a hydraulic test.  New tubes are on order for the other locos and it is hoped to deal with them as soon as labour becomes available.

A limited amount of maintenance has been started inside the Royal Saloon thanks to Richard Middle and Arthur Chatfield, again a couple more members here would help out, particularly while the weather holds good.

Two of the younger members whose names escape me at present have been putting a coat of protective paint on the E1, again a much needed job well done.

From time to time we get requests from various bodies and individuals to help in storing rolling stock and in particular steam locomotives.

I feel that in the interests of all concerned it would be a sensible idea to say that while we have every sympathy and will try to advise such bodies and individuals, we cannot offer any hope of storage space either at Chasewater or Hednesford.  Our present commitments with our own existing stock preclude us from offering help.  I would ask all who read this to realise the difficult position that we are in with regard to this matter, for it is better to put you in the picture than to disappoint you later.

Make no mistake about it however, for as soon as we are able I am sure that we shall assist all we can.

Chasewater Railway Museum Bits & Pieces 47, Mercian April 1969

Chasewater Railway Museum Bits & Pieces 47, Mercian April 1969

Manchester, Sheffield & Lincolnshire coach pre-Chasewater

 

This post was taken from various reports in the Mercian of April 1969

This Mercian seems to cover March/April and May/June 1969.

There as a new Editor for the magazine and the poor man in charge appears to have similar problems to any other magazine – a lack of articles!

 

Secretary’s Report – T.G.Cousens

After slow progress during the winter months at Chasewater, in which time only the arrival of the Manchester, Sheffield & Lincoln Railway coach broke the monotony of packing the track with red ash, progress is again in evidence.MSL Coach at Easingwold

The appointment of Mr.A.Holden to General Manager has seen marked changes in only a few short weeks, the most noticeable being the complete levelling of the compound and laying of track foundation into it.  Behind the scenes however, small departments have been formed to work on various aspects of the line with people responsible for each of the allocated tasks.

However, working parties are small so progress will be slow – do we have to wait until the line is operating to see 90% of the membership?!  Why not come down one Sunday afternoon and do a bit of shovelling, things will then begin to come to life.

A successful Open Day was held in conjunction with Messrs. Courtaulds Ltd., Coventry and organised by Gerald Wildish with the Company.  Many visitors arrived to photograph the two Pecketts, one, ‘Rocket’ was seen at work on the Foleshill Railway.  Many items were sold from the RPS stand which resulted in a fair profit to us.

The exhibition team was also at work at Huyton, Liverpool, at the preservation exhibition, the Open Day at Chasewater during the Easter week-end and the Stafford Railway Circle exhibition.

Well done to the members who attended these stands, especially the Huyton one.

The Barclay ‘Colin McAndrew’ was in steam on Easter Sunday and Monday under the able direction of Mike Lewis and Derek Luker.  She unfortunately blew a tube on the Sunday but after a quick trip by Rob Duffill (our hero!!) to Hixon for a spare, the locomotive crew replaced the defective tube and raised steam for a second time the same day!  No stock was hauled because of work required on the track – members please note.  Until this work is done Open Days will be severely restricted, so may we see more of you assisting at Chasewater.Colin McAndrew at Greening Wireworks, Warrington.

From the Public Relations Officer’s Page – G. Wildish

 

The first mention was of the next Open Days, June 28th and 29th 1969, with the expectation of large numbers of visitors and asking for members to come along and help.

There was a request for more photographs for the cover of the magazine, which unfortunately do not reproduce very well.  The Foleshill Railway Open Day had to be cut short and apologies were given to anyone affected.

A number of publications were mentioned – ‘Preserved locomotives of the World’ and ’Narrow Gauge Steam 1969’ for which a second impression is being prepared, later to be followed by ‘Narrow Gauge Steam 1970’

A publication for continental travellers – ‘German Steam’ has been prepared by an RPS member, so the Society is getting half of the profits, with thanks.

The final two publications were – ‘Railway Modeller’ which contained an article by Gerald Wildish and ‘Railway Enthusiasts Guide 1969/70’ which contained some information about the RPS.

There was an appeal for funds to move a locomotive of the Taff Vale Railway, and another appeal for volunteers to join a ‘paint in’ at Chasewater to give the rolling stock a much needed coat of paint.

Chasewater Railway Museum Jan 1969 Bits & Pieces 46

From the ‘Mercian’ of January 1969

From the Secretary’s Report  – Trevor G. Cousens

On 21 September 1968, the Society held its 9th Annual General Meeting at the Pear Tree Inn, Brownhills.  The attendance was very poor considering the attraction of a steam trip down the line afterwards.

After the meeting, sandwiches were supplied by Pete Parker, proprietor of the Pear Tree, and then members crossed the road where in brilliant evening sunshine stood the Andrew Barclay 0-4-0ST, (Colin McAndrew) immaculate in green and red, with polished brass and copper-work.

Members were invited on to the train comprising the Midland (or Coal Board) brake van, the Midland brake coach and the Great Western brake.  The train departed with Mr. Civil driving and Mr. Luker firing, the team, who with Mike Lewis had so painstakingly restored the locomotive.  She was opened up to pull the train up the 1 in 50 bank to the causeway causing the steam pressure to drop rather drastically to 40 lbs per square inch, but this is probably the longest run the loco has ever made without running over the same tracks twice, and its small boiler and firebox being designed more for a 3’ 6” gauge loco, this is not surprising.

Over the causeway, we ran on to the shore again until we were held up by some rather enthusiastic ditching by Bob Wormington, which caused the loco cylinders to come into contact with the spoil.  We ran on until we reached the end of the line, where a stop was made to raise steam for the return journey.  The loco was once again admired by the members, its rather peculiar mechanical pump a feature of interest on the running plate.

The return journey was made almost without incident, a point switched the wrong way round caused a minor sensation, but we returned safely to the Compound, where some rather complicated shunting was carried out before putting the engine to bed.  In fact, it was 9.00pm and dark when Laurence Hodgkinson finally put the diesel in with the rest of the stock which had been parked in the loop out of the way.

So ended the third RPS steaming at Chasewater, giving some encouragement to those who had worked so painstakingly to make this event possible.  But, it made one think about the amount of work still to be done, principally on track, but also on locos and stock before these steamings become a regular feature.

In the Treasurer’s Report by Frank Harvey, it was noted that, among others, Mr. R. Duffill  joined the Society!

Chasewater Railway Museum Bits & Pieces 45 More Aug 1968 Mercian

Chasewater Railway Museum

Photo: Robin Stewart-Smith.

More from the August 1968 ‘Mercian’

Turner’s Asbestos Cement Co. Ltd ‘Asbestos’

Hawthorn Leslie 2780 of 1909

By Gerald Wildish

Many of you will by now have seen our splendid new locomotive.  Two years ago exactly to the day that she left Trafford Park, I first found ‘Asbestos’ – 15th June 1966.  She was not working on that particular occasion and had been specially hauled out of the shed for me and put in a photographic position.  She appeared in excellent condition.  On the occasion of my visit I learnt that she was likely to finish working that September, and I duly put in a bid for the RPS.  I was informed that the Society’s interest had been noted.

A little over a year later a letter arrived from Turner’s asking me if I would care to bid for the engine – I made an offer of £50, and shortly afterwards received a telephone call informing me that a scrap merchant had offered £100 – we could have her if we could reach that figure.  By this time we were in October and I was already engaged in trying to raise funds for the Neilson.  My reply said that if they could hold the locomotive until after our Christmas raffle, we would do our best, but I did not hold out a great deal of hope.  Considering all things, the raffle was a success, but we did not raise the sums necessary to allow us to move in two directions and I informed the Company that we would have to let her go.

My surprise could not have been greater, when Mr. Francis, the manager of the buying department, rang me to say that we could have ‘Asbestos’ free of charge.  Without doubt this was one of the happiest days of my life.  I made arrangements to go to Trafford Park to arrange the handover and had an excellent morning.  The handover was arranged for a date three weeks later when the presentation plaque could be fixed to the locomotive.

I could not have been dealing with nicer people throughout the negotiations, right from the time of my first visit to the works.  Our thanks must go to Mr. A.H.Wailes, the Works Director, Mr. T.Noble, the Purchasing Director, Mr. T.N.Chadwick, the Works Manager, who also arranged for the locomotive to be ‘done up’ for us during the week before the handover, to Mr. W.D.Francis, the Purchasing Manager, who dealt with most of the negotiations and Mr. S.McCormick.

Little is known of the history of ‘Asbestos’.  She was built by Hawthorn Leslie in 1909, for the Washington Chemical Co. in County Durham, where she became No.2, along with two other Hawthorn Leslies and a Fox Walker engine.  A further Hawthorn Leslie was added in 1918, and presumably replaced the Fox Walker.  In 1920, the Company became part of the Turner and Newall group.

In 1933, two of the locomotives were transferred to the Turner’s Asbestos Cement Company works at Trafford Park, becoming ‘Turnall’ and ‘Asbestos’.  Turnall was scrapped in 1965, leaving ‘Asbestos’ with two diesel locomotives (Planets).  ‘Asbestos’ was placed in store as the reserve engine in 1966 and presented to the RPS on 25th May of this year(1968);  she was transferred to Chasewater on 15th June, and started work in revenue service eight days later.

Photo: Oct 1985 – Tony J.Griffin

Photo – Russ Hillier

Chasewater Railway Museum Bits & Pieces 44 Aug. 1968

Chasewater Railway Museum Bits & Pieces 44 Aug. 1968

Latest Arrivals at Chasewater

People living in the houses adjacent to the line have by now become used to seeing various types of low-loaders arriving with miscellaneous items of rolling stock, in fact on one memorable day two vehicles arrived at the same time.  One often wonders what the thoughts of these people are as more and more large relics appear at Chasewater.

Several items have arrived over the last two months.  The first and in many ways the most important was the Midland Railway crane from Hednesford.  Without this, our track laying project could not have been fulfilled and over the last eight weeks it has more than made up for its three years of inactivity at Hednesford.  Apart from being a valuable historic item, it is a most useful piece of equipment.

The Whitsuntide holiday saw the arrival of the South Eastern and Chatham Railway 6-wheel full brake from the Derwent Valley Light Railway at York.

Pic: http://www.bluebell-railway.co.uk

SECR Brake No.1601

This six-wheeled van, built in 1905, is unusual in that it has both a “birdcage” lookout on the roof and side duckets for the guard. In addition to accommodation for the guard, the rest of the space was used for luggage. On withdrawal it was transferred for service use as an ARP Cleansing Van, based at Bricklayers Arms Locomotive Depot in London.

With no further use for it after the war, in 1947 it was sold to the independent Derwent Valley Light Railway in Yorkshire. On its second withdrawal from service it was bought by the Southern Locomotive Preservation Co., who moved it, with the rest of their stock, to the Bluebell in late 1971 and early 1972.

The van’s eventual restoration will require, as its first stage, the complete reconstruction of its wooden/flitch-plated underframe.

It was at Chasewater for five years before being transferred to the Bluebell Railway.  It had to be left outside for the haulage company to make an early start, and in those few hours every window was smashed. ( I know there aren’t many but…..)

This was most eventful since it arrived a day early.  The usual entrance was locked and the haulage contractors came through the main entrance.  This involved a considerable amount of shunting on their part and eventually necessitated the complete removal of the main gates.  After becoming entangled with overhead power cables the vehicle was finally unloaded without a hitch!  The carriage is in the nature of a joint venture between the Society and our good friends the Southern Locomotive Preservation Company, the latter having purchased the coach while the RPS provided the bulk of the money needed for transportation.

The next arrival, on June 15th, was the Hawthorn Leslie 0-4-0ST ‘Asbestos’ from Turners Asbestos Cement, Trafford Park, Manchester.  In contrast to the previous item, this arrived about five hours late and completely disrupted work for the day.  However, the sight of this immaculately maintained locomotive more than made up for any inconvenience.Pic: DM Bathurst

This was followed one week later by our most distant acquisition, the Neilson 0-4-0ST from Glasgow, vandalised the day before collection, as posted elsewhere.

Before the next influx of new items, more track will have to be laid into the compound. As soon as this is done, the peace of the neighbourhood will once again be shattered by the noise of heavy haulage vehicles.

Frank Harvey

Chasewater Railway Museum Bits & Pieces 43.1 – Neilson on its way – most of it!

Chasewater Railway Museum Bits & Pieces 43.1 – Neilson on its way – most of it!

A not very satisfactory day

By G. Wildish

June 16th 1968, we were on our way to collect the Neilson locomotive – ‘we’ being Mary Grisdale and myself, Gerald Wildish.  The 4.00am train landed us in Glasgow shortly before 8.00am and after breakfast we arrived at Gartsherrie at 8.30.  Since our last visit, the works had been completely taken over by the scrap merchants, T.W.Ward, and this was the beginning of our trouble.

Reporting at the works – the manager said ‘Oh yes, the engine is there – go up and I will join you later.’  I went to the shed and was disgusted.  Some scrap thieves had removed all the brass clack and water valves.  The coupling and connecting rods had also been removed and cut up by oxy-acetylene equipment and were lying in pieces around the engine.  I returned to the manager and told him the story, ‘Oh yes, that happened yesterday, the police have been told’ – but why hadn’t he mentioned it to me earlier!

There was one locomotive with its motions still intact – No.3, and the manager agreed that we should tale these rods.  The next job was to remove them, they were stuck fast!  Mary traced some welders nearby with some cutting equipment and I gave them a back-hander to remove these for me – it took two and a half hours to get these pieces off satisfactorily. (It is highly probable that these men were the culprits from the day before).

Meanwhile the other problem was to remove the locomotive.  The line which we were to use for the removal – which it had been promised would be left for us – had been taken up!  At 9.00am the Wrekin Haulage people arrived and I took the driver on a tour of the lines and eventually we found one road-level stretch of line, but this was a mile and a quarter away.  The problem was to get the loco there.  The diesel loco of T.W.Ward was also in trouble and was unlikely to work.  However, I prevailed on two men to start and operate the diesel, but the brakes failed.  We agreed that I should operate the Neilson as a brake.  At 11 o’clock we succeeded in getting the Neilson to the low loader.  Two hours later we had got the coupling rods off the other Neilson and taken over to the low loader by a dumper truck.On her way!

Just before 4 o’clock the Neilson was loaded, but on arrival at the works entrance, the driver estimated that he could not get out!  Half-an-hour later, with the police controlling the traffic, the lorry nosed its way out and we set off for home.

Despite all our efforts, we are still two water and clack valves and injectors short.  New piping will be required to connect them with the loco and screws holding them to the boiler will have to be renewed as these have been mutilated by the acetylene equipment.  However, we have the loco – I pray that No.3’s rods fit.  Now that Millom Haematite Iron Ore Co. is to close down, we may be able to obtain spares from their Neilson, I sincerely hope so – I have written to them in anticipation.

Steaming at Chasewater

That is the end of Gerald Wildish’s article, but just to conclude – the Neilson locomotive took a while before it was used at Chasewater but was steamed successfully from 1975 till 1982.  After some years in storage and in the Heritage Centre it has now been moved into the workshop ready for renovation work, probably after the Hudswell Clarke S100 has been completed.In the Heritage Centre workshop

PS from Barry Bull – steamed September or October 1982 for her 100th birthday together with McLaren traction engine ‘Little Wonder’, also 100 years old, owned by the late John Mayes.Picture from http://www.steamscenes.org

Chasewater Railway Museum – More about the Neilson Loco – 1968

More about the Neilson Loco

A Trip to Gartsherrie

From 1968 Mercian Vol.1 No.3

By Trevor Cousens

On Friday, 16th February at 6.00pm a small party consisting of Lawrence Hodgkinson, Mike Lewis and myself, departed from Chasewater in Mike’s 30 cwt. Van en route for Gartsherrie, near Glasgow.  The purpose of this trip was to purchase spare parts from the three Neilson locomotives remaining at Bairds and Scottish Steel Ltd.

A stop was made in Derby to pick up Steve Allsop, then we cut across to the M6 motorway.  The speed of Mike’s van was limited by a governor to 45 mph so the going was slow.

It was quite a relief when a stop was made at a service area for refreshment.  We made full use of the transport drivers eating facilities – in our overalls we did not really have much choice.  Back on the motorway we continued our journey northward.  I retired to the back of the van to try to sleep.  After rolling my sleeping bag out amongst several hundredweights of tools, bars, rucksacks and other bric-a-brac I tried persistently to sleep.  The noise of the engine and the tyres on the road, coupled with a sharp drop in the temperature precluded this.  I heard someone groan ‘snow’ from up front.  This is what we had dreaded.  A climb up Shap with eight inches of snow on the ground!!  After this, sleep was impossible.  I lay on my back and watched icicles form on the van roof.  About 3.30am on the Saturday morning the van halted.  After many gear changes, reverses and sliding of doors up front there was silence for a moment.  When I looked out we were parked on a small snow-covered country lane; fir trees on one side, a railway above us and the moon shining across snow-covered fields.  They had had enough for the evening, and Steve, Lawrence and Mike came aft for sleeping bags, blankets, camp beds and other items necessary for comfort!!  While the three sorted themselves out I got out with a camera and had a prowl around.  I found that we had parked practically under the West Coast main line at Beattock.

In front of us Brush type 4s pounded up to Beattock Summit, assisted by English Electric type 4s, 2s, and 1s on the night mail trains and sleepers.  One could not help thinking that there was something missing not seeing the flicker from the firebox silhouetting the fireman as he shovelled rapidly on a ‘Duchess’ at full pelt up the bank.

The others had comfortably settled down by now in the back of the van.  I chose the driver’s seat as I was sure that it could be no more uncomfortable than trying to lie down again.  With last reminders to wake up at 6.45 am to be in Glasgow for 8.30 am, we dozed off to sleep, a sleep punctuated by the clatter of trains over the bridge above and the wail of diesel horns as bankers attached and detached from the trains – we couldn’t have picked a quieter spot!!

At 7.00 am Lawrence and Steve spent 20 minutes trying to wake Mike, who seemed to be the only one who had really slept, despite the noise (still, he is a railwayman).  We slowly began to thaw out when we were back on the main road to  Glasgow, and the sun came out, picking out the snow-covered hills in a fiery pink light,

Arriving in Glasgow at 9.30 am we met the fifth member of our party – Gerald Wildish – who had travelled up on the overnight train from Darlington to Glasgow without any heating.

Neilson at Gartsherrie

After a meal we arrived at Bairds and Scottish Steel’s works about 11.00 am, where we weighed in and were directed to the loco shed.  We mat a Scottish RPS representative who was also buying spares for their Neilson.  After having a look at our Neilson tucked away in the workshops inside this gigantic, desolate steelworks, we proceeded to the engine sheds where we worked in pitch darkness with the odd brilliant ray of sunshine punching a dazzling beam across the shed, and with snow dripping from the smoke vents onto our heads.  We dismantled the spares from the three scrap Neilsons and filled Mike’s van with spare parts.  An amusing interlude was enacted when Gerald held tea-cups under the water crane to be washed out while I pulled the cord, drowning both the cups and Gerald in several hundred gallons of water.

The load was examined by Bairds and we were weighed out – 10 cwt. Of spares aboard.  We then proceeded to the coal mines at Gartshore where we saw the Scottish RPS Neilson and an Andrew Barclay still simmering next to a red hot brazier which we stood around for 15 minutes to warm ourselves before returning to Glasgow, to a hotel and a well-earned drink.  The hotel we had chosen to stay at was unfortunately a rather expensive one.  I think they were rather shocked to see four really scruffy individuals – black all over with soot and dirt and in need of shaves.  We were ushered up the back lift to two attic type rooms – but they had hot water and beds!!

The Saturday evening was spent feeding and drinking and we bade farewell to Gerald who was lodging in another part of Glasgow, prior to his departure back to Darlington.  We all turned in, forgetting to put forward the alarm clocks and so missing breakfast by one hour!!  Room service rang us at 10.00 am Sunday, and we cajoled the waitress to find us four late breakfasts.  At 11.00am we made a start back towards Chasewater, after buying all the Sunday newspapers.  We stopped for diesel at Lockerbie and continued south, the sun was beginning to thaw the snow and a thick mist was rising.  Suddenly out of the mist our way was blocked by two policemen!!  They directed us to the side, and asked why we carried no ‘C’ licence.  They asked to see the load.  When we opened the door what a sight must have met their eyes, with piping strewn diagonally across the floor of the van, a 20 ton lifting jack, and many other items, including a kettle boiling on a primus for tea!!  After lengthy explanations, the showing of membership cards, driving licenses, etc., we finally convinced them that we were law-abiding, but we could not help thinking of Gerald on his way home with the receipt in his pocket!

Arriving at Hixon at 8.00 pm Sunday evening, we unloaded the spares and drove over to Hednesford for a sandwich and a drink in the ‘Queens Arms’.  The rest of the RPS crew from Chasewater and Hednesford were there, and the tales of the week-end working parties were exchanged.  Mike’s van had changed colour from dark green to white as a result of the salt spray.

So ended a 700 mile excursion to salvage parts which we hope will be used to help keep our 85 year-old Neilson running.  If so, then it will have been worth while.At Chasewater – August 1969

Chasewater Railway Museum – A Bits & Pieces article from Mercian Vol.1 No.3 1968

A Bits & Pieces article from Mercian Vol.1 No.3 1968

Taken from the Mercian Vol.1 No.3 an article by Gerald Wildish about our Neilson Locomotive. (Now, in 2020, in private ownership.)Shown here carrying the ‘Alfred Paget’ Nameplate

Neilson & Son Ltd., No.2937 of 1882

Bairds & Scottish Steel  Ltd.’s No.11

Delving back through the records of Bairds & Scottish Steel Ltd., one comes across several interesting details about the locomotive which we hope will be at Chasewater before the summer is out.  Some of this information which has come into my hands is included in this article.

No.11 was the fifth locomotive built by Neilson’s for Bairds, two of which were six-coupled.  She was the second 14-inch four-coupled built for Bairds. (The first, No.13 – built in 1876 passed to the NCB in 1948 and will eventually find a home at Falkirk).  Supplied new to Bairds in 1882, she cost £1,275.  Engines built to this design cost Bairds between £925 and £1,300, the cheapest being the last, the second, No.3 delivered in 1889.

My own personal records of No.11 go back no further than 1889, but in May 1900 a new firebox and tubes were fitted.  The next major repairs were in 1911 when a further new firebox and tubes were fitted.  A minor overhaul took place when a new right-hand coal bunker was supplied and the tank replaced.

After 1916 the records became scant until 1934 when greater detail is once again recorded.  In January 1936 another semi-major overhaul took place: new plates were provided for the boiler and a new brake assembly was fitted.  A year later the firebox was patched and all mountings ‘done-up’.  In July 1938 she was stopped again for general repairs and in November was fitted with a new firebox, repairs continuing until March, 1939.

In 1941, 4 new tyres were fitted, new brasses being added at the same time during a heavy general repair.  She returned to the works in June 1943 when the boiler and firebox were condemned, but was back at work with new boiler and firebox, a patched tank and new brake cylinder block and shaft in less than six weeks.  It shows what work can be carried out quickly during war time. (Due to the pressure of keeping engines at work, No.1 – the ex GERJ 15 class was sent to Cowlairs for overhaul.)  A further new firebox was fitted in August, 1945 during another heavy overhaul.

New tyres were fitted in the general overhaul of 1947, but the next interesting occurrence came in the heavy overhaul of 1949, after fitting new tubes, a further new firebox was fitted and the boiler removed for hydraulic testing.  However, when being removed for testing, the rope broke damaging the boiler, which had then to be lifted into the shed and rebuilt on the frames for testing again.  Eventually the boiler was hydraulically tested to 200 lbs. and steam to 135lbs.

Fireboxes seemed to wear out very quickly on the Neilsons for the 1950 firebox fractured in 1954 and was presumably replaced although the records do not state this.  General repairs followed in 1958 and 1963, when the boiler was announced to be satisfactory and in June 1967, just before the works closed.

When the works closed in July, apart from being the second oldest working locomotive in the British Isles, No.11 was the last to be repaired at the Gartsherrie Works.  She is in excellent mechanical order and when inspected by the engineers in February of this year (1968), it was pronounced that she would be the best of the RPS stock in this direction.  She lacks paint – I have no record of her being painted after 1950 – and remains in the post-war black.  She was never repainted dark blue as were many of her contemporaries at Gartsherrie.  We hope, funds permitting, to move her to Chasewater at the end of May or early June.  We have enough money to complete the purchase but we are still short of removal funds by several pounds.

Summary of dimensions:

Weight: 28 tons, Boiler Pressure: 120lbs. per sq.in.

Overall Length: 23ft 7ins.  Tractive Effort: 8885lbs.  Height: 10ft 10ins.Line drawing of the Neilson also by Gerald Wildish

Chasewater Railway Museum 1968 Vol.1 No.3 Bits & Pieces 42.3

Chasewater Railway Museum 1968 Vol.1 No.3 Bits & Pieces 42.3

Plus Stocklist – 1968

This is one of a number of articles included in this magazine – there will be another couple to follow later. I don’t know what happened to this loco, but in spite of it being purchased and delivered to Chasewater, it hasn’t steamed since!

Hudswell Clarke 0-6-0ST No.431 – By Frank Harvey

Working at Desborough – V F Hall

 

The previous issue of the Mercian featured several photographs of this, our latest locomotive, and it was felt that a short article about it would not be out of place.

It was built by Hudswell Clarke & Co., Leeds in 1895, works number 431 and spent most of its life in the hands of the Sheepbridge Coal & Iron Company in whose fleet she became No.15.  It was allocated the name ‘Sheepbridge No.25’, but this was never carried and with the removal of its official number and works plates ran its last years without any identification at all.

It has on two occasions been rebuilt, first in 1928 and secondly in 1944, by the Sheepbridge Company themselves.

The engine was first suggested as a suitable candidate for preservation some two years ago when it was one of several locomotives at work at Desborough Warren Quarry near Kettering.  One by one its companions were withdrawn leaving No.15 as the only workable source of motive power.  After closure of the quarry it assisted with the lifting of the track, until the early part of 1967 when it too was withdrawn and stored in the engine shed at Desborough in company with an Avonside 0-6-0T.

The RPS then stepped in and after pleasing, successful negotiations with Stewarts and Lloyds Ltd., the locomotive was purchased.  The firm kindly allowed us to steam the engine before purchase – and members will have read about this eventful weekend in the last issue of the magazine. (CRM Bits & Pieces No.41).

It proved to be in good working order and required little in the way of attention save for the fitting of two new injectors which have now been purchased, and the repairing of a cracked blower pipe.  Evidence of this can be seen clearly in the photographs!

Desborough, 1968

The locomotive was delivered to Chasewater in November and restoration is now well under way.  When completed it will be resplendent in apple green, lined black, edged white and a high standard is being achieved.Chasewater August 1969

Purchase and transport charges tended to deplete the Society’s funds somewhat, but all agree that it was money well spent and in common with all other RPS stock, no money is outstanding, a fact of which we are justifiably proud.

Although restoration is unlikely to be completed before 1969, we look forward to seeing No.15, the oldest working Hudswell Clarke, in steam at Chasewater later this year.In the Heritage Centre, 2010

Stocklist – 1968

With so many new additions, it was decided to publish a stocklist in the 1968 Mercian, Vol.1 No.3

I hope you can read it ok, it’s interesting to see what’s still here after 40-odd years, and what’s gone.