Category Archives: Bits and Pieces

Chasewater Railway Museum Bits and Pieces No 78.

Chasewater Railway Museum Bits & Pieces 78 – Aug/Sept 1977

The Railway Preservation Society Newsletter

Chasewater News 21 – Part 1

From the Editorial

Negotiations regarding the purchase of the line are fast approaching a climax and soon we will be obliged to undertake heavy expenditure for two to three years before any benefit from the additional length of line can be gained.  We therefore need every member to rally round and help the railway in any way they can.  We have proved that the railway can be run successfully for 1,000 yards or so and hopefully it will be three times as successful when we are running three times the length – remember, the best is yet to come!

News from the line

The compound has been tidied up during the season, especially for the ‘Transport Scene’.  Recent visits to preservation sites in West Yorkshire confirm that Chasewater has done much to shake off its ‘scrapyard’ appearance and no longer languishes at the bottom of the league table in regard to tidiness.

It is now up to all members to keep the place tidy, especially in putting kit away at the end of the day.

Lancs & Yorks No.1

Bob plans to restore ex L & Y ‘petrol pudding’ No.1 during the close season and a return to Lancashire & Yorkshire Railway colours is mooted.

The platform has been extended to include a lever frame, built with considerable ingenuity by General Manager , Derek Luker.  The next task is to extend the platform down to the signal.  This will be the full length needed at that end of the line.  When this is done the track will be re-aligned (if necessary) and work will start on interlocking and signalling of the layout.  This, coupled with completion of the new siding, should keep the ‘track gang’ well occupied until the middle of the winter period.  On the locomotive side both ‘Alfred Paget’ and ‘Invicta’ continue to handle the train service with consummate ease.  ‘Invicta’ now sports a uniform coat of Great Western top coat, but further external renovation is beyond our capacity at the moment, (where are you Mike?) whilst ‘Paget’ remains much as it was.  ‘Invicta’ has had much maintenance done to it by Derek Cartwright and Mick Webb in between steamings to make it a more efficient unit.  Bob Wormington has kept diesels Nos. 20 and 21 serviceable and improved their reliability considerably. 

Hibberd No.1 Ex Pitsteel

The ex-Pitsteel Hibberd (No.1) has had a repaint by courtesy of Messrs. Bull and Patterson and the same team have given the Hudswell Clarke 0-6-0ST a further coat of paint.

Hudswell Clarke 0-6-0ST

Hawthorn Leslie ‘Asbestos’ awaits a visit by the boiler inspector.  It is hoped to avoid excessive expenditure by operating the loco at reduced boiler pressure for a couple of years.  Peckett 0-4-0ST ‘Lion’ has had its boiler washed out and appears to be in excellent all round condition apart from a leaky water tank.  Its owner is looking into the possibility of returning it to coal burning when restoration is commenced, hopefully before the end of the year.  In the meantime it has had a further coat of paint.  Andrew Louch has resigned as head of the carriage and wagon department due to excessive commitments and has been succeeded by John Elsley, who has really made his presence felt by starting the long-awaited re-panelling of the LNWR Travelling Post office.  Already a third of the vehicle has been re-panelled by John, aided by Derek Cartwright, and Dave Ives has removed much of the paint off the Manchester, Sheffield & Lincoln coach in preparation for a repaint.  It is intended to get all the coaches in a similar external condition before doing any internal work.

Mr. J.C. James of Huyton, Liverpool has purchased a 1,000 gallon pillar tank from the Manchester Ship Canal at Pomona No. 4 Dock, Manchester.  This will shortly be removed to Chasewater for erection adjacent to the platform.  This will greatly ease loco watering and we are indebted to Mr. James for acquiring it.  (This tank replaces the ex. GWR tank which ‘disappeared’ in 1975, only scorched grass giving a clue to where it had gone).

Museum Acquisitions

Recent acquisitions have included a GWR trespass plate, an LNWR cast iron boundary marker and several LMS concrete boundary markers which will be placed at suitable places alongside our line.

Also obtained have been several railway postcards, including two LNWR official postcards.

Perhaps the most interesting acquisition has been some Seacombe, Hoylake and Deeside paper work by courtesy of Mr. Ray Franks of Great Barr.

It is pleasing to note that following the appeal for cast iron signs to be painted, several members have come forward to offer their services.  Several remain to be done, so there’s scope for anyone who fancies it.

Board Room Notes

Since its resurgence earlier in the year, the Chasewater Light Railway Company has undergone a great deal of internal change.  Sales of Shares in the Company have gone extremely well, 57 shares having been sold since the turn of the year, bringing in £285.  Sales are going well enough for the Company to seek to extend its capital from £2,000 to £10,000.  This will be done at the AGM.

A development fund has been established into which all money raised for any development project will be paid.  This will save a multiplicity of funds and will ease administration and expense.  (NB: the ‘E1’ fund remains a separate entity, being a project by a specific group of members).

E1 Notes

There is much of interest to report as the Committee meeting of 18th August it was agreed, in principle, to sell the ‘E1’ locomotive to the ‘Stroudley E1 Loco Centenary Fund’ for the sum of £3,000.  This is subject to ratification by the AGM of September 17th and also to the drawing up of a suitable set of terms agreeable to both sides.  The real outcome of this is that the E1 will remain at Chasewater, will stand a better than evens chance of restoration to working order, and the RPS will get a cheque for £3,000 which will be a substantial deposit for the loop line.

Late News

The water tower from Manchester arrived safely from Manchester over the August Bank Holiday weekend.

‘Asbestos’ has had its ultra-sonic boiler test and needs £300 worth of welding and riveting repairs to three corners of the firebox.  It now awaits a hydraulic test to ascertain the condition of the boiler tubes before repairs can proceed.

We will have access to the whole of the line soon, in all probability from 1st January, 1978, to enable essential work to be carried out.  August Bank Holiday Sunday was the third best day for passenger receipts ever, over 1,000 people being carried.

The Model Railway Exhibition over the weekend of 3rd, 4th September was a roaring success, a total profit of well over £200 being made.

Chasewater News was written by Ian Patterson typed by Dorothy Ives and printed by Robert Ives through the courtesy of the Vicar of Colwich.

Chasewater Railway Museum Bits and Pieces No.77

Chasewater Railway Museum Bits & Pieces 77 – June 1977

The Railway Preservation Society Newsletter

Chasewater News 20

The Editorial pointed out  that the more active members of the RPS are just getting over the ‘Jubilee Weekend’ to be straight away flung into the run in to the ‘Transport Scene’ weekend – the same dozen or so have to carry on the normal operating season as well!  There followed the usual appeal for more help, but explained that ‘if the response to this appeal is the usual one, then I’ve been wasting my time, but unless we get more active support then the Chasewater Project will go backwards, not forwards, and disillusionment will set in amongst the members, ending in the folding of the RPS in the not too distant future.  I’m not being alarmist but unless we are able to purchase the loop line then the active membership will be decimated and that is fact, remember ‘Bridge that gap – buy a Yard of Track’.

News from the line

There’s been plenty going on at Chasewater since the last report.  On the locomotive front ‘Invicta’ passed its boiler and steaming tests and is in the final stages of a repaint, whilst ‘Alfred Paget’ carries on regardless, being smartened up in between steamings. ‘Asbestos’ has had its tank jacked up and boiler lagging removed in preparation for an ultrasonic boiler test, which will ascertain what, if any, repairs are necessary.  Depending upon what the result and cost is, it will be reassembled as a static exhibit or be returned to traffic, hopefully the latter.

The DMU vehicle has been professionally repainted in maroon livery at great expense.  It is to be lined out and have transfers added as and when time permits.  The repainting of this vehicle has, in my opinion, been the greatest step forward taken by the railway for some considerable time.  The interior of the vehicle is to be refurbished during the wintertime.

The extension to the platform continues and the lever frame is being installed with associated interlocking and track improvements.

Stop Press: it is hoped to acquire Hednesford No.3 signal box to house the lever frame, negotiations with BR are underway.  The station has been improved by the installation of two gas lamp standards and a few cast iron signs to give a more business like appearance.  The present terminus will be named ‘Brownhills West’ on completion of the platform.

Further up the line much packing and levelling, along with spot sleeper replacement, has gone on in order to finish off the present stretch of line and to give a smoother run.

Operating Days

As you may realise we are chronically understaffed on operating days with the brothers Curtis performing sterling work in the bookstall as well as being the usual guard/ticket collector crew and managing to be in three places at once.

Train receipts are down on last season, mainly due to the inclement weather of our operating days.  Easter Monday has been the most successful day, over 700 people taking a journey.

Over Jubilee weekend, another RPS first was notched up, with trains being run on the Sunday, Monday and Tuesday, all being hauled by the Neilson locomotive ‘Alfred Paget’.

No.11 Neilson 0-4-0ST 2937-1882 Taken at either Bedlay or Gartsherrie, still working for a living!

Receipts were poor and the Tuesday steaming was done mainly for good public relations, 93 people from the Hednesford Road street party being given free rides to strengthen relations between the railway and the local people.  This has also resulted in a good publicity plug, as we were the only railway to run in conjunction with a street party.

The TPO roof is now watertight and re-panelling of the sides will take place in due course, whilst its tarpaulins have been placed over the LNWR 3rd brake coach in order to hide it as it continues to fall apart!

The GWR brake van has suffered at the hands of some juvenile delinquents who set fire to it.  Fortunately damage was confined to the verandah but restoration will not be speedy unless someone volunteers to take it on – outside of the usual workforce.

Chasewater Light Railway Company notes

The Kraken hath awoke and the first AGM for eighteen months was held in April.  The Board are now trying to formulate future policy for the railway in conjunction with the RPS Committee and hopefully sensible plans will emerge in the next few weeks, details of which will be placed in the newsletter for members’ comments.

Track Fund

Only £120 has been raised so far, a pathetic reflection upon the concern about the future of the Society by the members.  Money is needed now as time is running short.

E1 Fund

Most of the money so far raised has been spent on advertising.  If you feel you can contribute anything to this fund contact us.

The locomotive has been inspected by Messrs. Barlow of Warrington, a reputable firm of boiler makers, who have given an extremely reasonable set of quotes for repair of the locomotive boiler.  Time is running short if this locomotive is to remain at Chasewater as the AGM two years ago instructed the committee to dispose of the loco as a last resort to buy the loop line, and unless someone pumps a hell of a lot of money into either the E1 fund or the track fund, then the Society will have to face what seems to be inevitable – the loss of our only ‘local engine’ which is also  our only ‘main line’ loco, and the  most interesting of all our locos.

Notes from Barry Bull Hon. Sec.

The arrival of a complete 7¼” gauge railway, with a steam loco, heralded a possibility of something being in steam every Sunday at Chasewater this summer.  Unfortunately the loco blew its superheaters on a trial steaming and has been relegated to a static display.  The loco is based on the Southern Region ‘Schools’ class of loco and was one of a pair built in 1934 and so is a worthy exhibit in its own right.

Items purchased or donated during the past few months include an LNWR ‘Beware of the Trains’ sign, a concrete GCR boundary post, a few items of LNER cutlery, a selection of Kent & East Sussex Railway paper work, a Wemyss Private Railway rule book and a sign of LMS origin.

Transport Scene July 23/24

Rapid developments regarding this event have taken place and the organiser sent the following note for inclusion:-

‘This event is aimed at raising money towards our track fund and towards giving our railway a publicity boost.  This is perhaps the most important event to have been organised by the RPS so far, so I would have thought that some of our armchair members would have offered their services to our already hard pressed stalwarts.  However, this does not appear to be so.  In fact, so far, I have received only three offers of help.  We are in our most critical year, which could literally make or break our Society, so please, please help us, even if it is only in a small way’.

‘Chasewater News’ is written by Ian Patterson, typed by Dorothy Ives and printed by Rob Ives.

Chasewater Railway Museum – Bits and Pieces No. 76

Chasewater Railway Museum Bits & Pieces 76 – April 1977

The Railway Preservation Society Newsletter

Chasewater News 19

Editorial

With the operating season nearly upon us, it is becoming increasingly obvious that the same few regular volunteers will be responsible for the operation of the railway during the coming season.  Appeals for extra help during the closed season have had the usual minimal response but the usual crowd have ensured that the railway will reopen as scheduled on the 10th April.  In many ways the RPS is the Cinderella of the operating preserved railways, but it reflects great credit upon the dozen or so people who have turned up week in, week out, enduring rain, sleet and snow, that we have entered our sixth season of steam-hauled services, which promises to be our most successful yet.

Locomotives

Pride of place must go to the ancient Neilson ‘Alfred Paget’.  Although built as long ago as 1882 it passed its steam test on 17th March with flying colours.  This was the result of much hard work by the engineering department in re-machining parts of the motion, which had earned it the nickname of ‘shake, rattle and roll’ in some circles.  The planned repaint for the Neilson has had to be delayed due to the adverse weather conditions.

‘Invicta’ the Andrew Barclay saddletank has passed its visual inspection and now awaits re-assembly of cab fittings, etc., and then a steam test before re-entering service again.  Its owner is still threatening to complete its restoration by giving it a uniform coat of Great Western green!

Unfortunately ‘Asbestos’ repairs are beyond our financial resources at the moment and so it has been put to one side until we have the necessary cash.

The next major locomotive job is to strip the Peckett 0-4-0ST ‘Lion’ in preparation for its major hydraulic test.  The two Worthington diesels have had repairs as and where necessary and are both serviceable at the moment.

Lion in 1978 with ‘Colonel’  Plate

It is pleasing to report that the Company are financing a complete repaint of the DMU trailer coach by a local firm of contractors, in the early stages of the season.  The expected final livery is grey roof, crimson lake bodywork and black underframe and running gear.  Great progress has been made with regard to trackwork with the construction of a point for a siding at the crossing.  This took less than a month despite the fact that the recently restored petrol crane broke its main shaft whilst lifting the first piece of rail into place.  Several crossing timbers were obtained by our general manager at a bargain price.  Ballasting and packing has been completed, considerably eased by the use of the tractor and bucket scoop, kept in trim by Brian Hames.

The footings of the lever frame have been laid.  The necessary walls should be built during Easter week, enabling the platform to be extended to its full length.

Other work carried out on site has been mainly in tidying up in preparation for the coming season.  A scrap drive resulted in a load of scrap being sold to bolster the Society’s coffers.  The sale of the engine out of the scrapped J4 van realised £25.

The Travelling Post Office has been partially re-roofed, with more to follow to make it water-tight again.  Re-panelling of this vehicle is to commence when the weather becomes drier.

The visit to South Yorkshire area of the Coal Board 9mentioned in the last Newsletter) was not entirely unsuccessful, as, although we failed (only just) to obtain the locomotive ‘Beatrice’, the Hon. Sec. was successful in obtaining many locomotive spares, notably boiler tubes and firebars from Rockingham Colliery.

Stroudley E1 Locomotive Centenary FundNo.110 Southern No. 4

Not a lot to report this month, but ads in Railway Magazine have been paid for to counter the apathy amongst Society members.  A rather neat handout has been produced and is obtainable.   Certain preservative work has been done on the locomotive and a repaint is planned before the high season.  More help and money is urgently needed for this project to succeed.

Track Fund

Negotiations within Walsall Council continue and a final decision is awaited.

The Chasewater Light Railway Company has awakened from its apparent siesta and a general meeting will shortly be arranged.

Meanwhile all members are urged to take up the offer of buying a yard of track, as the success of this fund will decide the fate of our Society.  Albert Haywood is the person to contact regarding the track fund and every £10 donation is certified.

Museum

Thanks are due once again to Mr. Clift of Chase terrace, who has donated a 25 ton locomotive jack, once used in the Central Workshops at the far end of our line, and a pile of magazines for resale.  On the museum front latest acquisitions have included a Great Western and Midland Railway joint cast iron notice and two very nice bridge numbers of Manchester South Junction and Altrincham and West Riding and Grimsby Joint origins.  Smaller items include a GWR paycheck, an LNWR (Walsall) paycheck, an LNWR 1894 handbill, LSWR carriage blind, a small GWR cream jug complete with crest and six LMS tickets, mostly from the Brownhills area.

The March meeting was a slide competition and there were close on 100 entries of varying quality, though every entrant had at least one slide in the last twenty.  The competition was won convincingly by Nigel Canning’s photo of ‘Asbestos’ taken from within the dark confines of the cab of the Hudswell Clarke.

Chasewater Railway Museum Bits and Pieces 75

Chasewater Railway Museum Bits & Pieces 75 – Feb 1977

The Railway Preservation Society Newsletter

Chasewater News 18 – Part 2

On 26th January Barry Bull, Adrian Pearson and myself (Ian Patterson?) journeyed up to the North Yorkshire area of the NCB to inspect some redundant steam locos for possible purchase.  On the way up we visited Rom River Engineering of Lichfield and noticed the unique Kerr Stuart diesel alongside the ex-Cadbury’s North British diesel hydraulic.

Further north we passed the Butterley Headquarters of the Midland railway Project Group.  I understand from Derek Cartwright that our Royal Saloon, at present on loan to the Group, is at present undergoing considerable restoration at Derby Carriage Works.

The first colliery we visited was Ackton Hall at Featherstone.  This revealed a surprise in the form of Bagnall Austerity No. 2746 of 1944, which had arrived the previous week from nearby Prince of Wales Colliery.  This loco is of great interest to me because it used to work over the Shropshire and Montgomery Line.  The other engine at the colliery was the purpose of our visit, being No.S119 ‘Beatrice’, a 16” inside cylindered six coupled loco built by Hunslet, No.2705 of 1945.  This engine was in excellent condition, the fitters confirmed this, wishing it wasn’t for sale.  This engine is of the same class as ‘Robert Nelson No.4’ and others which worked at Littleton Colliery.  We also enjoyed a trip down the line to the BR exchange sidings on a diesel with the chief fitter, who told us several interesting facts about the history of the colliery and its locos.

The next colliery visited was Parkhill Colliery which revealed S102 ‘Cathryn’ a six coupled Hudswell Clarke side tank No.1884 of 1955 of the PLA Class.  This too appeared in excellent condition but inspection of the boiler report confirmed to the worst our suspicions about its firebox which needed well over £1,000 worth of repairs.

‘Monckton No.1’

Passing under the footbridge into a very quiet looking Embsay station – possibly the last train of the day? Note the bunting on the station and the stone flags through the gap by the ticket office and cabman’s shelter.

(c) Tom Ireland

North Gawber Colliery revealed a rather battered Austerity Hunslet 3212 of 1945, which was unlikely to be saved.  The same colliery also revealed another Austerity ‘Monckton No.1’ HC 3788 of 1953 which is spare engine at the colliery.  Out of the three on offer, we have bid only for ‘Beatrice’, an engine of ideal size for use at Chasewater.

The recent ARPS meeting at York was also of interest, several RPS members travelling up on BR, who managed to put an engine with no form of heating at all on the front of the train!

The National Railway Museum is well worth a visit, but the display of small relics is very poor and if the officers there care to visit Winchcombe Museum they will see what can be done with railway bric-a-brac.

David Ingham from Bury, Lancashire, England

One of the two preserved Princess Royals, 6201 Princess Elizabeth at Castleton East Junction signal box.

The meeting itself was of interest as the Annual RPS Award was given to the Princess Elizabeth Locomotive Society, a sister group of the RPS, for their efforts in restoring ‘Lizzie’ to main line condition despite enormous odds.

Well done the ARPS in choosing such a worthy group of so few members as opposed to one of the larger, richer groups, and Well Done the ‘Lizzie’ Society, in achieving such a remarkable feat.

It is pleasing to note that the Police have recovered many of the stolen objects from the museum vehicle, though the fact that the culprits were aged nine and ten is not so pleasing.

Recent acquisitions have included:

1.    A diamond weight restriction sign of Sheffield and South Yorkshire Navigation origin (once owned by MSLR)

2.    An Oxford Canal Navigation sign.

3.    Sharpness New Locks and Gloucester Canal Company weight restriction sign

4.    Two different sets of six official LNWR postcards from the early 1900s.  One set depicts castles and the other, Welsh Inland Resorts.

We now have 58 different LNWR official postcards, but over 1,000 different ones are known to exist.

Important

Pic from Barry Bull’s Collection

The RPS is organising a Transport Festival at Chasewater Park over the weekend of July 23rd and 24th.  This will feature vintage cars, buses, steam rollers and traction engines as well as the RPS.  We need your help for this venture, the first of its kind to be held by us.  This event may prove vital to our finances this year.

Late News

On the second of February an open meeting regarding the financial aspects of the RPS was held.  This meeting was very poorly attended despite the fact that many members were aware of its existence.  Despite this setback it was decided to launch an appeal to buy the loopline.  The people present were seen to represent an accurate cross-section of active RPS members and a majority of the executive committee were present to authorise the steps taken.  In brief these were:

1.    To set up a fund to purchase the loopline, as a proposed rent of £1,400 per year is beyond the Society’s reach.

2.    This appeal is to go under the slogan of “BRIDGE THAT GAP, BUY A YARD OF TRACK”.

3.    Money shall be raised by donations, those exceeding £10 or in multiples thereof being certified as representing the purchase of one yard of track.

4.    There will be no ceiling on the appeal as in future years the NCB may press for purchase of the northern end of the line.

5.    All monies raised will be placed in a Building Society to maximise its purchasing power.

6.    This appeal will be fully advertised in ‘Railway Magazine’ and ‘Railway Modeller’ as these are the two magazines with the highest circulation in their field.

7.    Handbills will be produced and sent to all interested persons and visitors to Chasewater this year.

8.    All RPS members are urged to start the ball rolling.

BRIDGE THAT GAP, BUY A YARD OF TRACK

The future of the Chasewater Light Railway depends on YOU.

Steam Loco Drivers

Albert Haywood, Chairman of the RPS, has asked me to inform all members of the need for fully trained drivers for the season’s trains.  To this end, training will be given at Chasewater before the start of the running season.  All persons wishing to be considered should apply in person or in writing to Albert.  When a list of all members wishing to take part is gained then a scheme of training and passing out will be drawn up.

Chasewater Railway Museum Bits and Pieces No.74

Chasewater Railway Museum Bits & Pieces 74 – Feb 1977

The Railway Preservation Society Newsletter

Chasewater News 18 – Part 1

From the Editorial

Recent activity at Chasewater has mainly centered on general maintenance, including some considerable tidying up of the entrance to the compound.  Footings for a lever frame have been dug at the present end of the platform and we now await some good weather to mix the necessary concrete.  The flat wagon on which the petrol crane sits has been re-timbered and strengthened and the crane itself has had some much needed maintenance.  On the locomotive side, work has been centred on the Neilson ‘Alfred Paget’ which has been re-assembled after its boiler test.  The coupling rods are at present dismantled to enable the crosshead slippers to be replaced with a spare pair which have been re-metalled.  It is hoped this will cure some of the knocks emanating from the front end of this engine.

Neilson in 1978

Extracts from the report of the visit of Major Olver of the Railway Inspectorate to Chasewater on 22-7-1976.

1.    Major Olver stated that he was quite satisfied with the present mode of passenger operation at Chasewater.  He asked that a facing point lock be fitted at the end of the main running line.

2.    When the tipping within the park has stopped, a concrete raft with the rails set into it should be installed at the road crossing.

3.    There is a major problem of trespass in the region of the causeway which is used as a public right of way.  This problem must be looked into in detail before the Society even thinks of running trains along this section of line.

4.    The arrangements for repair and restoration of locos are perfectly satisfactory.

5.    In reference to the need for a Light Railway Order, Major Olver explained that the section of line owned by British Railways was a statutory railway and therefore a Light Railway Order was needed to transfer its ownership.  He went on to say that common sense indicated that any Light Railway Order obtained should be made to apply to the whole of the Railway.  The Railway Inspectorate and Railway Administration side of the department will be happy to advise on the question of the Light Railway Order at the appropriate time.  Major Olver suggested that the most satisfactory solution may lie in the precedent set by the West Somerset Railway, which would be for Walsall Metropolitan Council to obtain the LRO and to incorporate it into the leasing arrangements.

6.    Training for drivers – the present arrangements were far from ideal as the Society relies on its own resources to train drivers.  Major Olver stated that drivers should be passed out by an independently qualified supervisor from either British Railways or the National Coal Board.  Major Olver explained that in the case of an accident there should be no room to question the basic abilities of the loco driver to drive the locomotive efficiently.  At the present time this was not proven.  Editor’s Note – This was the only point on which we were criticised and steps to rectify this are underway.

News on the purchase of the line

The executive committee heard that the Council couldn’t purchase the land and track until the 15th July.  There appear to be two present options:

1.    The Council buy the loopline and we repay £1,400 rent for ten years.

2.    We buy and pay a nominal rent to the Council.

Much discussion is at present taking place amongst members on this question and further suggestions are welcomed by contacting the Hon.Sec.

The Stroudley E1 Restoration Fund

E1 at Cannock Wood

This body is the result of the meeting held at Chasewater on 22nd January.  Only nine people turned up to this meeting, perhaps indicating the level of interest for this project within the Society.

The first aim of the Society is to raise enough money to purchase the E1 from the Society, a figure in excess of £3,000.  There are now four Societies at least, interested in buying the E1 if the RPS has to sell it.

£155.50 has so far been raised and local press coverage has been good but due to the lack of local interest the appeal must go national.  Offers of help, monetary or otherwise, should be sent to Mr. Albert Haywood.

Chasewater Railway Museum – Bits and Pieces No. 73

Chasewater Railway Museum Bits & Pieces 73 – Dec 1976

The Railway Preservation Society Newsletter

Chasewater News – Part 2

Outline Planning Permission has been granted for an engine shed between the platform and the crossing.  Anyone knowing the whereabouts of a suitable building which could be obtained cheaply or be donated is urged to contact the Hon. Sec.  Also needed are sources of cheap, good condition crossing timbers and sleepers, the latter preferably concrete.

Whilst on the subject of wants it is interesting to note that a small group of members have been trying to purchase another locomotive for the line, but have been outbid on three successive occasions.  The locos in question were the Bagnall 0-4-0ST at Northampton Power Station, the Hudswell Clarke 0-4-0ST at Carlisle Power Station and most recently, a Robert Stephenson & Hawthorn 0-4-0ST at Leicester Power Station.  With the current prices being paid for locos it may be that we need more cash.  Any offers of help should be directed to the Hon. Editor.  We have several more locos in the pipeline, all of which are in, or near to, working order.  We really want an 0-6-0ST or Tank, but these are few and far between and so a four-coupled is more likely.

Littleton Colliery. A successful open day was held here on November 20th, many RPS members being in attendance.  The Austerity No.7 performed in its usual vociferous style.  Thanks are due to Messrs. Matthews and Worgan of the National Coal Board.

Austerity No.7 at Littleton

Winter Work Programme. This is largely centered on the long awaited completion of the platform and installation of a lever frame.  Associated trackwork. Manly involving packing, is already in hand.  Other projects are the dismantling of ‘Asbestos’, general maintenance and tidying up and when the weather improves, a start on re-panelling the TPO.  Once again more help is needed and no offers refused, don’t be shy, we don’t bite!

The loco shed siding is also due for laying before Easter, involving construction of another point.

Museum Exhibits. Despite the break-in several interesting items have been added, notably a Cannock Chase colliery bridge plate – many thanks to Mr. Clift of Chase Terrace for this unique item.

Cannock Wood with Asbestos at Chasewater

E1 Locomotive – ‘Cannock Wood’

The E1 locomotive came into the possession of the Railway Preservation Society in 1964.  Had it not been for the RPS the locomotive would probably have been scrapped at that time.

From that time until the present, it has received a couple of coates of paint and a tidy up sufficient for a Boiler Inspector to shake his head in dismay at the firebox.

Its future depends on you! As some of you will recall, the AGM of 1975 gave the Committee permission to sell the E1 as a last resort to raise cash for the purchase of the British Railways section of track and land.

The Walsall Metropolitan Council, it would appear, will be unlikely to supply the cash for the purchase of land and track, although this has not been confirmed.

Two verbal offers have been received for the E1 and a written offer is being obtained by the Committee from the interested parties.  The locomotive is likely to bring in £3,500 which is probably about a third of the cost of the land and track.

Notice of Meeting

A meeting will be held at Chasewater at 2.30pm on the 22-1-1977.

The meeting will be for the purpose of bringing interested parties together with a view to the following:

1.    To set up a restoration fund to purchase the E1 from the RPS at current price.  The fund should be a separate body from the RPS.

2.    After purchasing the Locomotive, raise the cash to restore it.

3.    Operate the Locomotive at Chasewater.

It should be noted that only a few months are available to raise the first £3,500.  If we have the ability to do that, we have the ability to restore and operate it.

If we are not able to raise the purchase price, the Locomotive will be better off elsewhere, where it can be restored and operated.

Remember

London, Brighton and South Coast Railway.

Built 1877  Brighton Works.

No.110.

Name: ‘Burgundy’

100th engine built at Brighton Works under Stroudley.

Sold 1926 to Cannock & Rugeley Collieries Ltd.

Name: ‘Cannock Wood’

No.9

Sold 1964 to the Railway Preservation Society.

1877 – 1977 Centenary

No other locomotive of this type survives.

Happy 100th birthday ‘Cannock Wood’

A.W.Haywood – Chairman RPS

The following is from the East Somerset Railway website:

Withdrawn for a second time in 1963, the engine was sold to the Railway Preservation Society and stored at Hednesford until 1970, when it was moved to the Chasewater railway. There it remained until sold to three members of the East Somerset Railway, finally arriving at Cranmore in September 1978.

A general overhaul was commenced in 1986 and it returned to active service in 1993, painted in green livery and numbered 110. It pulled it first train in service on Sunday 24th October of that year. In 1996, No. 110 could be found transporting visitors to the Festival of the Sea on Bristol’s Harbour Railway. Unfortunately, firebox problems resulted in No. 110 being prematurely withdrawn from traffic in 1997.

During 2000, work commenced on stripping the locomotive down to assess the extent of the firebox problems, after which the locomotive will be rebuilt. Current progress on this project can be found on the <a href=”http://www.railwayweb.com/clf”>Cranmore Loco Fund website</a>.

In 2012, B110 was sold to the Isle of Wight Steam Railway, in return for LMS Ivatt Class 2 no. 46447 moving to the ESR. The railway plans to restore the engine and run it as No. W2 Yarmouth, which was an identity previously worn by one of the Isle of Wight-based E1s.

Chasewater Railway Museum – Bits and Pieces 55

Chasewater Railway Museum 

Bits and Pieces 55

Asbestos with the Maryport & Carlisle Coach and GW brake van

The follow-on to the previous post.

Everything out of Hednesford

From the Mercian August 1970

Secretary’s Report

They said it couldn’t be done – but it was!!!  Done by sheer hard slogging and the aid of a clapped out tractor.

Little did I think that the Cadbury van and the two open wagons at Hednesford would not be moved by road and that what I jokingly referred to last time would in fact become a reality.  It was!!  Six – yes six – of us spent two nights digging the sunken track and point out of a couple of feet of hard mud and rubble so that we could hand-shunt the wagons off the siding and onto the main section where we could couple them up to the passenger stock for removal by rail.

Deadline was Thursday evening so we had only three nights to organise the job.  It took the whole of Tuesday and part of Wednesday to dig the track out and we managed to move one of the wagons along to the point ready for transhipment.  However it stuck fast and all our efforts failed to make any impression on it.  This did not auger well for the other wagon and the van and we were almost on the point of giving it up as a bad job.

Then we spotted the tractor and after making a few quick calls we discovered that it belonged to the President, albeit he thought it was out of action with some parts missing.  A quick tickle up by the Treasurer soon proved him wrong and all was set.  We found a length of hawser and soon had the first wagon over the point.  Our troubles were solved you might think but unfortunately they were not.  There was no rail beyond the point and the wagon had to be towed onto the semi-hard ground of the yard.  The point (stub type) would not budge so the next problem was how to line up the wheels for the correct road.  This we did by towing the wagon back onto the point and then jacking up one end clear of the rail.  The jack was then knocked away sideways so as to throw the wheel flanges onto the right side of the line.  After much trial and error we managed the first one and it was coupled up to the passenger stock.  The second wagon followed similarly and by this time it was getting dusk.  We held a council of war and decided that unless the van was moved then it would have to remain at Hednesford for ever.  Out came the hurricane lamps and we trundled the van down to the points.  By this time there was quite a groove in the yard surface and the van soon found the level.  We jacked her up and with some pushing and heaving and a tug from the tractor we managed to move her into the right line where she joined the rest of the stock at about 10.30pm.

How stupid – possibly this is your first thought – can some members be? But let me say right here and now that if it wasn’t for such stalwarts and in particular those six who struggled so gamely to do a very important job, the Society would be highly successful resting on the laurels and efforts of its armchair and featherbed members.

I DON’T THINK

Those three vehicles are now at Chasewater thanks to the six, but had it been left to our non-regulars then they would have rotted away at Hednesford.  Members should be thankful that we have a solid core of stalwarts who do care about the future and who will do something about it.

Stirring it up am I – you’re damn right I am.  Where were YOU when we ran our most successful steam weekend to date?  I refer to the 27th/28th June when we were operating a small service and an exhibition as part of the Aldridge/Brownhills Festival of Sport.

I understand from the Social Organiser that he sent 10/- worth (50p) of Draw tickets and appeals for help on the days of the Festival to all members living within a 20 – 25 mile radius of the site in an effort to boost the funds.  Needless to say the response – altogether not unexpected – was NIL.  A few members did manage to sell some tickets and the surprising fact was that most of these were members whose subs were due, and not paid-up members – to me a disgusting state of affairs.

We have about 120 members scattered about the country and I am fully aware that it is not possible for all of you to attend on site due to distance away.  We have certain members who regularly donate £5 – £50 when we need to raise money urgently, we have a member who purchased one of our locos for us.  I am not getting at these members or the faithful band that turn out regularly each weekend.

I am getting at the shower – there is no other word for them – who think we can run on their subs alone.  Like other Societies I think that we can manage without this type of member even if we only have 20 members who care enough to pull their weight when we need them to.

Reverting to the weekend, the weather marred the Saturday operations, however it was all systems go on the Sunday when, had we had about another 20 members available we could have made a very fat profit form the Draw from ticket touting among the crowd which packed the Park.

I have said it many times before and I will say it again, we MUST have more help when we run these steam weekends.  The next Open Day will be Sunday August 30th.  Make a note of it NOW!

We need quite a few hands between now and then for track repairs, stock repairs and restoration and a host of other jobs too numerous to mention.  Every Sunday afternoon from 2.00pm whatever the weather we can find plenty to do, so may we see you on site fully prepared to do a little hard work.

It is a pity that every time I prepare this report all I seem to do is belay a large number of members who are close enough to the site to be able to make at least two or three visits a month.

What a change it will be when the day arrives that I can report that the turnout on working parties each week has been 30 members and that they have now completely relaid the trackwork, the three coaches are fully restored and operational, three steam locos are available and a service will be operated each weekend.

There is no reason why this should not be so if members will rid themselves of their apathy.

Hon Sec. A.A.Chatfield

 

Now a follow-up from the General Manager’s stock news

Chasewater News

Apart from the usual lack of manpower things have been happening on site this past three or four weeks in preparation for the Festival Weekend and other events.

In the last issue I summarised the various jobs to be done and this met with a fair response so I will repeat it again this month.

Asbestos

I am pleased to report that she is now fully operational and was successfully steamed on June 20th on the occasion of the visit paid by the L.C.G.B  Under the able hands of Mike Lewis she was again performing for the Festival Weekend and proved quite an attraction.

Barclay

The boiler inspector’s report has now been received and he has condemned her boiler.  This means we shall have to either order a new one, which at this stage is financially out of the question, or we may be able to buy a reasonable second-hand one from one of three or four of the same class which are known to be still operational.  To help defray the cost we propose to sell the old boiler as scrap.  In the meantime the loco will be put back together as a static exhibit.

Neilson


Work will now be put in hand to strip this loco down for a boiler inspection.  We understand that the boiler is in good condition and that we should be able to get the loco operational by next summer providing we have enough man-power to work on her.  Mike Lewis will again be dealing with the job and he will need some assistance.  Any offers?

Hudswell and Lance

These will be kept oiled and painted until after the work on the Neilson has been done.  Again, any offers?

Cannock Wood

I am pleased to report that this is now safely at Chasewater having been delivered on June 26th.  It is unlikely that she will run in the foreseeable future as a new boiler will be needed if reports which we have are correct.  Work will therefore be confined to a thorough repaint and general restoration as a static exhibit.  This should keep a couple of members fully occupied for the next few months, so may I have some volunteers?

 

Diesel No.1

This is still out of commission, have we any members who are knowledgeable enough to work on her, please?

Diesels 20/21

Pic – Ross Lockley

These are both running now and are in need of a repaint.  I hope to make one or the other available fro this purpose during the next month or so.  It should not take too long to refurbish the paintwork on both of them and if any members would like to help then please contact the Secretary on site.  He will be supervising this part of the work.

Petrol No.1

Through the efforts of Arthur Chatfield who did the bulk of the restoration work on this loco, it was just about ready for display at Messrs. Dorman’s Ltd. exhibition in Stafford from June 22nd to July 4th.  I am grateful to him, for the hard work he put in on this project and for the assistance that he received from the Chairman.  The loco proved to be quite an attraction at Dorman’s and I am sure we may receive some benefit from the resulting publicity.

Other Rolling Stock

Apart from the stock already on site you will have read in this issue that the two open wagons and the Cadbury van have now been delivered to Chasewater.  These have also bee joined by the Maryport & Carlisle coach and the LNWR Brake bogie van.  The ‘Paddy’ coach and the TPO coach are due in the very near future and also the GER six-wheeler.   This will only leave the Royal Saloon, and the Committee have agreed in principle, subject to various safeguards, that this vehicle should be placed on loan to the Midland Railway Project Group at Derby.  Should the Group decline then arrangements will be made to transfer it to Chasewater.

From this you will note that all our assets will be at one site and there is a lot of work to be done on them.  John Elsley has already offered to repair the roof on the Maryport & Carlisle and to do other jobs on it so that it may be available for the Bank Holiday weekend.  A start has been made by Bob Ives and Phil Dunning on repainting one of the open wagons.  There is plenty of other work to do particularly reproofing jobs and if John Elsley can have two more members to assist him he is prepared to tackle the GWR Brake, the LNWR Brake and the SECR Brake roofs, so that they may be watertight before the winter sets in.

Another top priority will be the laying of the other siding in the compound so that all the stock may be put under lock and key.  It is imperative that this work should be completed as quickly as possible and as many hands as possible will be needed.  I should like to see this job done before the middle of August and if we can get a real good turnout we should be able to meet this deadline.  Is it too much to ask, in spite of the holiday period?

Well that’s about the size of it.  There is plenty to do and enough to keep 50 members fully occupied between now and the end of the year.  We can find plenty of tools and materials to do these jobs – what we also need are the hands to do them!

You have read what six members can achieve when pushed hard, please try and think what 30 regulars could do at a more leisurely pace if I could persuade them to turn up on site each Sunday afternoon for the next two or three months.

Won’t you give it a try?

A. Holden, General Manager, Chasewater Site.

Chasewater Railway Museum – Bits and Pieces 54 from the ‘Mercian’ May 1970

Chasewater Railway Museum – Bits and Pieces 54 from the ‘Mercian’ May 1970

 

Rolling Stock Report

Chasewater Site

The following schedule of commitments refers only to the present stock on site; these will be greatly enhanced when certain other stock has been safely delivered from Hednesford.  We have a tight schedule to keep if we are going to provide a steam operated line this year and it is imperative that we get under way as soon as possible.

 

Asbestos

Boiler lagging and fittings have been removed and all applicable joints packed for a hydraulic test.  The initial inspection has been carried out by the boiler inspector who has okayed the boiler as fit, subject to some plugs being replaced and another test run before he issues the certificate.

The boiler barrel and underside of the tank are being red-leaded and painted.  Work is under the supervision of Mike Lewis who will need another two reliable assistants as soon as possible.  Work on lowering the tank, etc. will be done as soon as the boiler inspector has finished his tests.

 

Barclay – Colin McAndrew

This has been completely dismantled in preparation for repairs to the firebox stays by an outside contractor.  All the old tubes have also been withdrawn and will be replaced when the other repairs are done.  A lot of work will then be required to put the loco together ready for the boiler tests and final restoration including painting.  Mike Lewis is again supervising and needs two more assistants.

 

Neilson, Hudswell & Lance

Work on these three will have to be confined to oiling, greasing and generally touching up of paintwork, etc. until work has been satisfactorily done on the other two locos.  Volunteers are required for this.

 

Diesel No.1

This is at present out of commission with gear and clutch trouble.  Have we any reliable members who have knowledge of the workings of diesels and who could take this loco in hand?  Our regular fitters are already taxed to the limit with the other diesels.

 

Diesels Nos. 20/21

Minor repairs to the injectors and other routine work is well in hand on these two.  Both are due for a complete repaint and again volunteers conversant with the trade are asked to come forward.  Arthur Chatfield would be pleased to hear from you.

 

Petrol No.1

Cleaning down work is now well in hand.  This loco has to be ready for exhibition at Dorman’s Ltd., Stafford for week commencing June 22nd.  This leaves very little time for the two regulars seconded to the job.  More help is needed here; again, volunteers are required most urgently.

 

Other Rolling Stock

This has been lumped together because the variety of jobs required on most of the vehicles is almost identical.  Two of the coaches are sheeted over due to leaking roofs, anybody care to take on the job of re-felting them?  It will need at least two people.  There are also a considerable number of loose or cracked panels which need attention before they are painted in undercoat.  The running board on the Great Western brake needs repairing and re-bolting and of course a real good start on painting the interiors of the passenger stock would not be amiss.  There is enough work to allocate at least three people to each item of stock or a gang of five regulars tackling each item in order of urgency.  We cannot spare this number from the present compliment; we need more of you on site to help us do this vital work.

It may also be stated that there is a lot of work to be done to the Trackwork and again more help is needed.

No offer of assistance will be refused – this cannot be afforded.

A. Holden – General Manager, Chasewater Site.

 

 

Secretary’s Report from the ‘Mercian’ May 1970

 

It seems that my forecast for the movement of the smaller items of stock from Hednesford to Chasewater was way off the beam.  Let me hasten to add that several snags cropped up which had to be examined with regard to the transport.

Those of you who are familiar with the layout of the yard at Hednesford will know that there is an acute angle bend to be negotiated by any road vehicle which is delivering to or conveying from the yard any bulky items.  This unfortunately precludes all but the smallest type of low-loader, and the one that we had lined up for moving the four wheelers would not go round the corner.

We have, through the good offices of our President, made another approach to a different operator and we hope that he has a vehicle which can do the job.  If this fails then we shall have to dig out the point to the spur upon which the wagons are standing, this having sunk into the thick mud, so that we can shunt the wagons onto the main siding for removal by rail with the other stock.  The Coal Board have informed us that they will move the stock up to Cannock Wood Colliery yard either the first or second week of May and we now await clearance from British Rail that the stock is fit to run over the line to the Colliery which is their property.  Once the stock is at the Colliery yard it will be put under lock and key in the compound and the smaller items, such as the six-wheelers, E1, and, if necessary the four-wheelers will be shipped from there to Chasewater by road as there are better loading facilities at the Colliery yard to manoeuvre a big low-loader.

I sincerely hope that my forecast that most of the smaller stock will be at Chasewater by the time you either read this or receive the next edition will in fact be true for we shall require some of it for use at the Festival of Sport and also for the late Bank Holiday in August.

To impress upon you the need for better turnouts at working parties, you will find included in this issue (following) a run down on the various items of rolling stock and brief details of work which urgently needs to be either started and carried through, or which has already been started and which needs completing.

It is an impossible task for the present working parties to cope with the amount of work available, and I plead to all members with cars to try and get along to the site prepared to put in at least a couple of hours graft.  The weather seems to be picking up so we must pray for plenty of sunshine as we rely on this due to the present lack of covered space where we can operate if it rains.  May I count on your help over the next few Saturdays and Sundays???

May I, before closing this report, welcome on your behalf our newly co-opted Social Organiser, Gordon Loach.  Gordon has had many years experience in running carnivals, garden parties and other such fund raisers, and with the help of his good lady Mrs. Loach and, we hope, a ladies committee, he will be able to bring a bit of social life to the society which is lacking at the present.

Hon. Sec. A.A.Chatfield

Chasewater Railway Museum Bits and Pieces 52

Chasewater Railway Museum

Bits and Pieces 52

Thirty Years Plus Ten

Travelling Post Office

Much as I enjoyed reading about Chasewater Railway in thirty years time, it never stood a realistic chance of happening.

After the cessation of coal traffic in the 1960s the line over the causeway was abandoned and the causeway itself fell into disrepair.  The track was lifted and passenger traffic suspended for a number of years. The main part of the 30-years-on idea had also gone missing in the intervening years – the line from the proposed Norton Junction to Norton Crossing.  The track which ran below the dam for the Swag pool was lifted and presumably sold for scrap.   The idea of a railway with a main line and a short branch disappeared.

It was not until 1985 that regular steamings began again, but in the intervening three steam-less years, membership had dropped by some 50 per cent. The Society deemed it necessary to prune its stock as it was realised that without an injection of cash, the whole affair might fold. The L&NWR Travelling Post Office went to Tyseley, a small “Planet” diesel went to Brian Roberts’ Tollerton Farm Railway, while individual members purchased two steam locos and one diesel loco in order that they could remain safely at Chasewater.

IN 1993 a successful scheme to restore the causeway was started.  About 120,000 tons of fill material were imported to the site.  This work was completed in 1994 and Lakeside Station was reopened in December. From 1985 till the reopening of Lakeside trains only ran push-pull from the old station to the Willow Vale Bridge.

Since 1995 a great deal of work has been done, firstly to extend the line to Chasewater Heaths and Chasetown.  Next came the new Brownhills West station and yard, to replace the old station and compound, now buried beneath the M6 Toll.  The engine shed was refurbished and another station opened at Chasewater Heaths – finally, so far, the Heritage Centre was built to hold the heritage stock and Museum.

The 30-years-on idea was not to be, it would have been fun in my opinion, and at that time, as stated in Post No.50, the rolling stock was owned by the railway – no steaming fees to be paid.  Of the stock mentioned in Post 51, the E1 left, never having steamed at Chasewater.  The Hudswell Clarke also has never steamed here – but it is still with us, although not owned by the railway. The Peckett went too, although we now have another one.  The Royal Saloon and Travelling Post office have also gone.

The Royal Saloon

Chasewater Railway Bits and Pieces 51 Jan 1969 Mercian

Pittsteel loco

This post pre-dates the previous one, which set out the way of thinking when this post was written.

Taken form the Mercian of January 1969

This article was written by Trevor Cousens, Hon.Sec. at the time, and looks forward, after the railway had been in operation for almost ten years, to how things may have been in another thirty years, 1998.

Reading it now in 2010 it gives a fascinating insight into what may have been expected or, at least, hoped for, some time ago.The purple mark is where Brownhills West used to be.  The red mark would have been Norton Crossing.The green mark – Norton Junction and the black mark Norton East.

 

Chasewater in thirty years time.

 

A glimpse into the future to show what might happen IF we could have more working members.

The scene, a fine May morning in the year 1998, the time 8.30am – a Saturday.  A group of members are just putting the finishing touches to the paint of a little halt known as Brownhills West.  The E1 stands glimmering in the early morning sunshine, fresh from its overhaul with a set of two corridor coaches in the maroon and gold livery of the Chasewater Light Railway Company.

In the distance there is the sound of a hydrofoil being started up in preparation for the day’s big event on the lake – the International Hydrofoil Race due to start at 10.30am.

A restored vintage train of coaches is pulled out of the museum building by diesel No.20, these coaches are for a special train in the afternoon when a visiting Society will be taken down the line; but first they have to be cleaned.  There are four six-wheeled vehicles and a four-wheeled brake van from five different pre-grouping railways, and not one under 70 years old.  Several members are concentrating their efforts on raising steam with the Hudswell Clarke of 1895 vintage, which will haul the special.  In her old livery of apple green with white lining she looks rather splendent.

Passengers are already starting to fill the waiting two coach train standing in the platform, the booking office and sales counter are already doing brisk trade.

At 9.00am, the E1 with a toot of her whistle and a wave of the flag from the guard draws out of the station on the first journey of the day to Norton Junction and Norton East.  The journey is but two miles, but this takes 25 minutes with a stop because of the Light Railway restriction of 15 mph.

The E1, with her injectors gurgling and safety valves occasionally blowing off, pulls towards ‘Entrance Crossing’ where the North Staffs crossing gates are signalled by North Staffs signals.  The signal is for us as the gates are open; a queue of cars is waiting to cross into the park.  We gather speed over the small bridge on to the loop; here we notice a small permanent was train standing, compromising of a small Peckett, a crane and some flat wagons, with a tool van in the rear.  They are waiting to follow us on to the main line to replace some rotten sleepers.

At Norton East we stop, nobody boards and nobody alights, it is a timetabled stop.  In the afternoons a shuttle service is operated from Norton Crossing to Norton Junction to connect with the main line to bring people into the park by railway, the authorities allowing this for a portion of the receipts.  The Peckett we noticed on the works train will be train engine on this push-pull service.

We pull out of Norton Junction up the 1 in 50 incline, on to the causeway, which divides Chasewater Pool.  Poplars have been planted here as a windbreak.  Over the causeway now we catch site of the small bathing chalets and notice one or two early swimmers.

Into the long cutting with its long grass and myriad of flowers and insects and we finally pass the loco shed at Norton East into the terminus.  While we are waiting for the engine to run around the coaches, we have a look around the engine shed; the Barclay is undergoing a boiler washout, so it is rather damp and messy inside.  The shed is quite a simple affair comprising one road capable of holding two saddle tanks, a pit underneath the track, a small workshop adjoining the main building, a bucket coaling stage outside and a 5,000 gallon water tank.  ‘Asbestos’, the Hawthorn Leslie stands at the back of the shed awaiting new tubes and a forlorn Peckett stands on a spur behind the shed awaiting overhaul.  Just in front of the shed are two piers built alongside the tracks with a piece of rail concreted between them for lifting boilers, etc.

The engine whistles, so we dart back to the sleeper-built platform – there is no station building here yet – and on to the train.  We start back at 10.00 am calling at Norton Junction again – the platform is triangular to serve the branch to Norton Crossing as well, the building is of prefabricated construction until a GWR type of building can be erected.

After departing from the junction we pass a small ground frame controlling the junction point and signals; we are then brought to a halt in the loop, where after five minutes, we look out of the window to see a small plume of smoke approaching; this is the permanent way train drawing into the loop to leave the line clear.  A green flag is waved, the signal drops and we once again cross the bridge and ‘Entrance Crossing’ back to Brownhills West.  The engine is uncoupled and runs up to the compound gates for water, we follow it and pass through the gates where we notice the Hudswell Clarke and the vintage train being cleaned in the siding.

We go into the museum for a look.  As most of the items are in use today, we see the LNWR compartment coach completely stripped down, the MR Royal Coach awaiting one or two finishing touches and the LNWR Travelling Post Office coach completely restored in its former livery.  These are the only vehicles at the moment in the museum, but there is room for the three six-wheelers in here also.  The walls are covered with historic photographs, plates, documents and drawings, whilst there are glass cases holding some small items such as block instruments, tablets, etc. The building is of concrete blocks with Perspex roof-lights and also with daylight balanced fluorescent lighting so that the colour of the liveries can be seen accurately.  There are not many people here, it is a bit early yet for visitors, and the staff are having a cup of tea with our engine crew in the Great Western brake van standing just outside,

Now it is lunch time, so we depart, having had a really enjoyable visit; the people are beginning to flock on to the 1.00pm train, we have done well to miss the crowds.  We hand in our ticket and make our way to our Turbocar!