Tag Archives: Cranmore

111 – Chasewater Railway Museum Bits & Pieces, from Chasewater News 1986/7

111 – Chasewater Railway Museum Bits & Pieces

 From ‘Chasewater News’ Winter 1986/7Magazine cover – a drawing of CLR No.5, the ex Walsall Gas Works Sentinel, by Steve Bent.

Following the “Reorganisation Day” of 22nd November there are at present three bodies which together form the Chasewater Project.

1       – Chasewater Light Railway and Museum Company – The CLR&M Co is responsible for the day to day and long term policies of the Railway as well as being the body to which the supporters and sympathisers of the Railway join.

The Officers of CLR & M Co. are:

CHAIRMAN – Steve Organ

GENERAL MANAGER – Tony Sale

ENGINEERING Manager – Nigel Canning

OPERATING MANAGER – Les Emery

COMMERCIAL MANAGER – Barry Bull

MARKETING MANAGER – Ian Patterson

FINANCIAL MANAGER – Bob Curtis

NON-EXECUTIVE – Colin Marklew

COMPANY SECRETARY – Adrian Hall

2       – Chasewater Light Railway Company – The old Company will remain in existence until its assets, debts and liabilities are transferred to the new Company.

There are at present two directors:

COMPANY SECRETARY – Adrian Pearson

CLR & M Co. NOMINEE – Adrian Hall

3       – Chasewater Light Railway Society – The Society is remaining in existence until such time as the CLR & M Co. attains charitable status, in order to safeguard the rolling stock and relics as well as holding the leases.

At present the CLRS has the following members: L.Hodgkinson, D.Ives, T.Sale, B.Bull and I.Patterson (CLR & M Co. Nominee)

The above mentioned are also the Trustees of the Society.

 News from the Line

Loco Department

No.2 is awaiting its turn for overhaul, a change of ownership is rumoured.

No.3 Slow progress with the firebox repairs may result in the frames making way for the GM’s machine (S100) in the shed.

No.4 Asbestos has performed satisfactorily during the season and is due for attention to its side rod brasses and regulator valve during the winter months.

No.5 59632 has also performed well and gets better with every steaming.  The vacuum brake system works to the required standard, much to the relief of all concerned.

No.6 All that can be reported is that we have exchanged a spare set of side rods in our possession for some missing boiler fittings (stolen some years ago).

No.7 The Ruston has been used occasionally for shunting but happily the increased use of ‘real’ motive power has made the engine somewhat redundant.

Neilson, Alfred Paget and Barclay Invicta

No.8 Invicta may well return to service during 1987 following a full boiler examination, platework repairs and fitting of vacuum brakes.

No.10 The frames of S100 have descended from their lofty perch and are temporarily mobile.  Once installed in the shed the wheelsets will be re-removed for attention to the hornguides and following a probable orgy of machining and highly technical stuff, the motion and valve gear can be reassembled – sounds easy, but it could take years (and years!).

No.11 The ancient Neilson languishes outside the shed awaiting its turn for attention.  (it’s now got as far as the workshop!)

No.21 The ex Bass Worthington ‘pudding’ awaits its replacement engine.

Wickham DMU

Several windows have been replaced following a spate of vandalism and new rainwater gutters have been fabricated and fitted.

The presence of blue asbestos (the mineral not the engine!) has been noted by the Railway Inspectorate and it will have to be removed from all three DMU coaches in the not too distant future.

Trackwork

Following Gricers Day work was concentrated on relaying Nop.1 road back to the remnants of S100.

This was swiftly accomplished and as mentioned elsewhere the frames of S100 were removed.  Once the boiler of S100 is removed the Great Eastern Coach should be rendered mobile, last having moved in about 1973!

Following the visit of Major Olver of the Railway Inspectorate on 3rd December work has centered on the installation of a catch point on Elsley’s siding which has been relaid.  The catch point is necessary to stop any stock rolling onto the main line when passenger trains are being operated.

Wooden Bodied Stock

Steve Organ has started the unenviable task of restoring the wooden bodied coaches, or at least making them weatherproof and presentable.

He is aiming to have the three six-wheelers and the four-wheel MR passenger brake fit for running demonstration trains (i.e. non-passenger carrying) by Gricers Day on 11-10-1987.

Needless to say all offers of help will be most welcome as the success of this laudable project rests on ADDITIONAL help coming forward.

So far the ex Maryport & Carlisle coach is nearly in the initial stage of acceptability whilst Mr. X (I can’t remember his name) is having a go on returning the ex MR four-wheeler to its pre MSC scheme condition.

Being highly optimistic, Organic Steve hopes to fit in a renovation of the brake end of the ex LNWR coach as a picture gallery (a what!!!!?)The afternoon ‘Paddy’ on the Hednesford to Cannock Wood line during the late 1950s.  The loco is the 1866 built Lilleshall 0-6-0ST ‘Rawnsley’ and the coach is the ex LNWR non-corridor composite now awaiting restoration at Chasewater.

 431 Hudswell Group Notes

The fund is approaching the half-way mark towards the purchase of the locomotive, so by this time next year the locomotive should be in the ownership of the group.

The recent visit of the Railway Inspectorate has provided the Group with a major setback as the boiler lagging of the locomotive must be professionally removed before restoration can begin, at a cast of well in excess of £500.

 Progress Report on ‘E1’ No.9 ‘Cannock Wood’The ex London, Brighton and South Coast Railway E1 No.110 ‘Burgundy’ seen coasting down te Cannock Wood branch in its later form as Cannock & Rugeley Colliery’s No.9 ‘Cannock Wood’

We have received the following report about the restoration of the E1, which members of long-standing will recall was sold to the East Somerset Railway at Cranmore in 1978.

“Work has progressed well……well sort of.  Things have not come apart as they should and caused some anxious moments for crane drivers and merriment for those on the ground.

The first part to come off this project was the right-hand intermediate axle box oiling pot, since then many other parts have been removed, cleaned, repaired, painted in works grey (we have a lot of grey) and given an I.D. disc.  This is then entered in a log book recording what the part is, where it comes from and what it does, sometimes accompanied by a small drawing to help relocation when we fling the engine back together!

The front sand boxes took a great deal of effort to part them from the frames due to two hundredweight of one hundred-year-old wet sand which corroded all the metal bits together.  These are well on the way to being rebuilt.

The brake rigging has caused some problem with the steam brake being rusted up solid, a badly pitted cylinder bore, the main shaft bent considerably and pull rod equalizer rods bent.

The side tanks came off using the Dubs crane tank and the ‘lift and move quickly backwards’ method, with much screeching and tearing of metal (must remember to burn off ALL the bolts next time!).

The cab roof came off with much reluctance, and when lowered on the ground it collapsed in a heap of rust.  As normal the bunker came off with difficulty leaving the bottom of the rear sand boxes still attached by rust, twisted and torn, to the frames.

Boiler work is coming along slowly with half the tubes out, pulled by the digger.  Some of the tubes are nearly new with no scale on, but a thin layer of rust.  The cab roof is to be repaired, whilst drawings are being prepared for the new side tanks.  The bunker will be remade on site by us in the near future.  The boiler has been de-lagged at a cost of £800 and should be lifted to enable the wheels to be removed and a start made on the waggly bits underneath.

Further news gleaned from the pages of Steam Railway (Jan 1987) reveals that restoration will cost in excess of £25,000 and may include a new firebox.

The loco will be finished in Southern Railway black livery as E110 and will be in as near to original condition as is practicable.

The unique Rawnsley chimney and the nameplates, etc. are to be returned to Chasewater in due course.”

Visit of the Railway Inspectorate 3-12-1986

Briefly they require some extra work on the track to that previously expected, but this should not present any problems.  The use of push-pull operations was agreed until such time as the motorway outcome was known.  However, a bell system between loco and coach must be installed and in the near future locos intended for passenger duties must be fitted with vacuum activated steam brake valves.

Apart from this, the major difficulty is the presence of blue asbestos as mentioned elsewhere.

Provided we comply with the Inspectorate’s requirements, a further inspection in the spring should leave us free to recommence regular steam hauled passenger trains.

The Future

The project engineer for the motorway has been to the railway and vaguely indicated as to where the new road may cross the railway.  Detailed plans are to be drawn up by the Departments consultants and will be put on public exhibition during the autumn.  Prior to this there is rumoured to be a public meeting in Burntwood Baths during April (What’s wrong with the lake at Chasewater?!).

Unless the railway can get a firm idea of how and where it can expand then the good work and impetus gained during 1986 will be lost.  To this end, a short list of possible alternative sites has been drawn up to be further investigated if it becomes apparent that we are ‘flogging a dead horse’ by remaining at Chasewater.

Chasewater Railway Museum Bits and Pieces Nos.85 and 86

Chasewater Railway Museum Bits & Pieces

No. 86

From the Chasewater News Magazine No. 24 July 1978 – 2

E1 Locomotive

‘Lord Fisher’ Barclay 0-4-0ST 1398/1915 – Pic by John CorneliusThis loco is now at the Yeovil Railway Centre where it will be restored with the Gartell Light Railway.

At the committee meeting of the 22nd March it was decided that positive action to safeguard the loopline was needed and in the view of the committee the best course of action was to offer the ex. LBSCR (London, Brighton & South Coast Railway) ‘E1’ locomotive for sale.  This decision was reached after much heated discussion, during the course of the meeting Andrew Louch resigned.  The rest of the members of the committee present were unanimous in their decision to sell the locomotive.  The Hon. Sec. was instructed to obtain offers for the locomotive and at the meeting of 24th May it was decided to sell the loco to ‘The Lord Fisher Loco Group’ who reside at the East Somerset Railway at Cranmore, Somerset. ‘Lord Fisher’ Barclay 0-4-0ST 1398/1915 – Pic by John CorneliusThis loco is now at the Yeovil Railway Centre where it will be restored with the Gartell Light Railway.

The LFLG own five engines at present, the ‘E1’ will be their sixth locomotive and if it is restored to their previous standards, then it will be well worth a visit.  They have every confidence of seeing the loco in steam during the early eighties and work will start as soon as it leaves Chasewater.

Members of the Chasewater Light Railway Society will be informed of progress upon the locomotive in this newsletter and the locomotive’s plates will remain at Chasewater as well as the unique tapered Rawnsley chimney, which will be mounted on the platform at Brownhills West.

The sale of the locomotive realised £5,000, which has virtually paid for the loopline.  Appeals in the newsletter and elsewhere have raised over £2,000, which gives us room to breathe a little easier, though we estimate at least another £5,000 is needed to realise our plans for the Chasewater Light Railway during the next three years.

The E1 arrived at Cranmore, Somerset in September, 1978.  The overhaul started in 1986 and she returned to service in 1993 – in green livery, number 110.  Firebox problems forced a premature withdrawal from traffic in 1997.  During 2000 work commenced stripping the loco down to assess the state of the firebox.The chimney is still at Cranmore, last heard of being used as a donation box.In the yard at Cranmore – Pic Bob Fowler

News from the line

The main news is that the purchase of the loopline is secure, as we have the money.  British Rail granted access to works trains as from the 18th April and completion of the purchase should be made by the end of this month (July).  However, this is just the start, as the line must be completely fenced before we can think of extending our services to satisfy the Railway Inspectorate and quite a bit of trackwork is needed, though generally the loop is in excellent condition.

Engineering Works

Over Easter weekend the point at the south end of the loop was dismantled and a start made upon reassembling it on a new alignment away from the edge of the embankment.  Part of the loop has been slewed to meet the new alignment and hopefully the gap will be completed before August Bank Holiday, to enable works trains to start removing scrub from the loopline.  The extension to the platform is now virtually complete, lacking only coping stones before it can be put into use.  The majority of the wall was built by Brian Hames over Spring bank Holiday weekend, infilled with hardcore supplied by courtesy of Walsall Council and surfaced with red ash by courtesy of Chasewater Power Boat Club.

Train Operations

This year has seen a welcome increase in the amount of money taken per steaming, only partially due to the modest fare increase implemented at the start of the season.  After 13 steamings receipts were 230% up on last year with an average of 380 people visiting the railway per operating day.

Small Relics Collection.Recent additions to the collection include a St. Helens Canal & Railway memo; an LMS/GWR joint lines trespass sign; a Midland and Great Northern Tyers tablet (Long Sutton – Gedney) and an LNER ‘Carter to Call’ card.Tyers Tablet

Brownhills CID has apprehended two local youths (thanks to the help of several CLRS members), who are due in court shortly to explain why they were in possession of many items from the museum coach.  Following the trial the missing items will be returned – at present Brownhills Police Station has a fair collection of railway relics!!

A visit to Derby Carriage Works is being arranged so that Society members can view progress on the restoration of our Royal Saloon (ex Midland Railway), which many members will know is on loan to Derby Corporation until 2020 if they take up their full option. (I think this was another of the crown jewels to be sold!)

Chasewater Railway Museum Bits & Pieces

No. 85

From the Chasewater News Magazine No. 24 July 1978

Time to get back to some Bits & Pieces – I found this article in Magazine 24.

The Society’s Pump Handle Trolley’s next adventure.

Since the summer of 1975, when three anonymous persons were jettisoned off the causeway at great speed, the Society’s pump handle trolley has been living in retirement (or was it disgrace?) off the rails, festooned with various cast iron signs.

During a recent tidy-up the trolley was ‘re-discovered’ by one of our younger members and once the day’s running was over the trolley was re-railed, oiled and found to be in a rather sorry state of repair.  Gary Kay foolishly offered to rebuild the trolley, so it was decided to give it a final run prior to overhaul.  The party was formed of the more lunatic fringe of the Society (though Graham has since had his hair cut) namely Messrs. Attwood, Bull, Owen, Webb, Patterson and last but not least, the brothers ‘Grimm’.

At first the run was to be to the crossing and return, but before we could say ‘every confidence’ or even ‘doom and despondency’ we were carrying the trolley across the infamous ‘gap’ (the ‘gap’ was out of the Brownhills West gate and over the bridge by the fishing pool) and onto the loopline.  The loopline was found to be passable – well almost – despite a few hassles with the odd wayward bush, but an attempt at a run down the Norton branch (to the Norton East Road and Conduit No. 3, not the Pelsall to Hednesford line) was thwarted by the locals having covered the track with rubbish – everything from a three piece suite to a dead cat.  After this an attempt at ascending the causeway was made, but this too was blocked, this time by several tons of hardcore tipped by the Council.

The return trip provided more excitement, a hasty start left Mr. Bull stranded brandishing a shovel, and quite a speed was attained.  Unfortunately we were halted in full steam by a large overgrown gorse bush, which forced an evacuation of the trolley rather sooner than most of the crew anticipated as they were jettisoned, arms and legs akimbo, and ended up with rather sore arms and legs and backs, though the elder ‘Grimm’ was more concerned about his station master’s hat which landed dangerously near a large puddle.

After several minutes of recovery time the trolley was re-railed and a slow return to Brownhills West was made, and although it had been proved that track still existed beyond the ‘gap’ there are several members who are beginning to think that perhaps 800 yards of railway is more than enough, especially for pump handle trolley racing!!Following the successful  re-enactment of the bucket-chain a couple of years ago, I asked Mr. Bull about a possible re-enactment of the trolley trip-  unfortunately his reply is not for publication!

Now tucked away in the Heritage Centre

Hand Pump Trolley

This trolley was purchased (after a whip –round!) from the British Rail permanent way yard in Walsall in the 1970s.  A few years later, in their 1981 session, it was renovated by students of the West Bromwich College of Commerce and Technology.